2.
Grease the threaded steel upper link tubes.
3.
Rotate the upper link to tighten the link. Adjust it
until the front of the aerator frame is 90 degrees from
horizontal (
).
4.
Tighten the locknut to secure the upper link into
position.
4
Connecting the PTO Shaft
Parts needed for this procedure:
1
Bolt (1/2 x 3 inches)
1
Nut (1/2 inch)
–
Short driveshaft, Part 115-2839 (may be needed; sold
separately)
Procedure
Important:
If necessary, install the short driveshaft,
Part 115-2839 (sold separately). In most cases, the short
driveshaft is not needed.
Refer to
and determine the position of the PTO
output shaft on the tractor, relative to the position of the
lower trailing arms. This distance is designated the “M”
dimension. The standard driveshaft included with your
aerator fits a tractor “M” dimension down to 48.89 cm (19.25
inches). If the “M” dimension is smaller, we offer an optional
shorter PTO driveshaft assembly (115-2839), which fits a
tractor “M” dimension down to 39.37 cm (15.50 inches).
It may be helpful to place a straightedge across the ends of
the trailing arms to determine the distance between them and
the end of the PTO output shaft end. Consult your tractor
operator’s manual for potential length adjustment capability
in the tractor trailing arm design. Contact your Authorized
Toro Distributor if you need any assistance to perform this
measurement and to order the driveshaft (115-2839), should
it be required.
g028690
Figure 9
1.
“M” dimension
3.
Tractor PTO output shaft
2.
Lower trailing arms
1.
On the ProCore 864 only, remove the lower PTO
shield (
g007295
Figure 10
1.
Lower PTO shield
(ProCore 864 only)
3.
Screw
2.
Tinnerman nut
2.
Connect PTO shaft to the gearbox input shaft with a
1/2 x 3.00 inch bolt and 1/2 inch nut (
11
Summary of Contents for ProCore 1298
Page 17: ...g028725 Figure 21 17...
Page 18: ...g028724 Figure 22 18...