Figure 96
1.
Quick-connect fitting
(flange shutoff valve)
4.
Hose—1.3 x 180 cm (1/2
x 83 inches)
2.
Retainer
5.
Front of the machine
3.
Straight barbed fitting
3.
Secure the straight barbed fitting and the quick-connect
fitting (
) with the retainer that you removed in
step
of
Installing the Shutoff Valve for the Optional
Spray Gun Kit or the Electric Hose Reel Kit (page 42)
.
4.
Route the supply hose forward along the sprayer tank
toward the hose reel (
5.
Assemble the inlet hose through the support clamp at
the forward strap of the sprayer tank (
Figure 97
1.
Hose—1.3 x 180 cm (1/2
x 83 inches)
2.
Support clamp
6.
Assemble the supply hose onto the barbed fitting at the
inlet of the hose reel (
), and secure the hose
with a hose clamp 13 to 32 mm (1/2 to 1-1/4 inches).
Figure 98
1.
Barbed fitting (inlet swivel)
3.
Supply hose (hose reel)
2.
Hose clamp
45
Summary of Contents for 136-0372
Page 61: ...Schematics Flow Diagram Rev A 61...
Page 62: ...Notes...
Page 63: ...Notes...
Page 64: ......