8
(1) Bottom handle
(2) Machine body
(3) Component housing
(4) Solution tank
(5) Top handle and solution cable
(6) Handle LH & RH
(7) Brush shafts (2)
(8) Screws & washers
(9) Cable retainer
(10) Power cord
(11) Dirty water tank
(12) Handle knobs
1. The Tornado BR 9/1 MW ships with the handle dismantled. To assemble, verify that all of the parts listed are
included.
2. Remove the black band, which holds the bottom handle with the machine body, while holding the bottom handle.
Warning
! Since the bottom handle is spring loaded, care must be taken when removing the hook to avoid
sudden springing back, leading to possible injury to personnel.
Unpack
(4)
(1)
(2)
(3)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Preparing for Use
How it Works
How it Works
1. Cleaning liquid in the solution tank is sprayed to the
floor.
The counter rotating brushes scrub the floor and also
throw the dirty water on the conveyor drum. The front
brush does most of the scrubbing and drying. The rear
brush completes the scrubbing and collects the
remaining water off the floor.
2. A blade fitted to the recovery tank wipes the drum and
collects the dirty water.
The purpose of these caps is to distinguish between different brushes
when the machine is used in different area. This just helps the operator
easily identify the brushes to avoid cross contamination.
Important
- Should the machine fail to operate, contact the supplier from whom you
purchased the machine.
Summary of Contents for 99409
Page 15: ...15 L9409 DA...