TORAY UF
Instruction Manual
06-G-MB2-HFUG-B2315AN-220930
18 of 35
Do not drop the module.
Use equipment such as chain blocks, a crane, or a
forklift truck when handling the module. The module is
too heavy to handle by hand.
Take care not to catch and hurt fingers.
Be careful not to install the module upside down.
Confirm the module is installed in the right direction.
Do not overtighten the module with the connections
and/or a support belt, or you may damage the module.
Do not allow the hollow fiber membranes and modules
to dry even for a few hours, especially in summer.
Do not freeze the module.
5. Connect the piping to each connection point of the module with Housing type joints and
screw (see Fig. 4). For the screw, use plastic connection and tighten by hand. When
tightening or loosening the Housing type joints, make certain to maintain sufficient space
prior to the work and be careful not to injure one’s fingers or other body parts.
Fig. 2. Typical example of the membrane module installation