12
6
. Sign the bolt-hole point on the gate post and gate. Do this by
placing a punch or a sign in the middle of each bolt slot on the post
bracket assemblies and the gate bracket. It allows slight
adjustments to the post bracket. Then remove the post bracket and
gate bracket by taking off the C-clamps.
7.
Drill 14mm diameter holes on the gate post and drill 9mm
diameter holes on the gate at the marked locations.
8.
Attach the post bracket assemblies to the gate posts by using
four expansion bolts.
9.
Attach the gate brackets to each gate by inserting two M8x80
bolts through the gate brackets and the drilled holes in the gates.
Fasten each bolt with one
¢
8 lock washer, and one
¢
8 nut.
10.
With the opener fully retracted and with the gate in the fully
closed position (for Push-to-Open installation), attach the gate
opener to the Post Bracket Assembly and the Gate Bracket by
inserting a thread pin through the gate opener and the Push to
Open Bracket and another thread pin through the gate opener and
the Gate Bracket.
Summary of Contents for MT9012
Page 6: ...3 MT9012 Parts List Extra parts for rounded gate post...
Page 18: ...15 Connecting of the Control Board...
Page 28: ...25 Quick Setting Guide...
Page 29: ...26...
Page 30: ...27...
Page 31: ...28...