Operation
LS-B2 Operator’s Manual
9
To Use the Infrared Option:
1
Position the IR-2 receiver so that it faces and is within
clear line of sight of the LS-B2.
2
Connect the IR-2 to the RD-2 with the attached cord.
Normally the IR-2 mounts on top of the RD-2.
However, by using an optional IR-2 extension cord,
you can mount the IR-2 in a location of your choice.
See your Topcon dealer for information.
3
Position the LS-B2 on the pole or pipe so that the
grade display window faces the IR-2.
When using the LS- B2 infrared option, power comes from the BT -
39Q battery pack, so no cords are necessary between the LS-B2 and
the RD-2 or between the LS-B2 and the machine’s battery.
LS-B2 and Automatic Control Systems
The LS-B2 can be used as part of most Topcon automatic control
systems. By connecting the LS- B2 to a Topcon control box and
integrating it into the system, the LS-B2 helps provide high
precision grade control to excavators, graders, pavers, dozers,
milling machines, and Ag land leveling machines. See your
machine control manual for operating and installation details.
Consult your dealer to equip your LS- B2 for automatic control
using its valve drivers and RD-2 control panel.
REMOTE IR-2
HORIZONTAL
MOUNTING
REMOTE IR-2
VERITICAL
MOUNTING
STANDARD IR-2
MOUNTING ON RD-2