TOP NOTCH SHOESTRING Assembly Manual Download Page 5

□ 

1.  Assemble the elevator core (EC) from two parts. This and the following steps are best done over a sheet 

of parchment paper. This material is available in your local grocery store in the baking department. Hey, if 

chocolate chip cookies won’t stick to it, glue doesn’t stand a chance. I digress. 

□ 

2.  With the core sheet flat on the bench, install all split ribs starting 

from S1. Hold the core sheet flat while applying thin CA.

Stabilizer assembly

□ 

13.  Assemble the elevator sections. Note that one elevator core also contains a ply plate to attach the horn to. 

Keep this in mind when hinging to get it on the desired side.

□ 

3.  When all ribs have been installed, install the trailing edge. Hold 

the trailing edge in place with the straight edge of a ruler or other 

straight edge while applying CA as shown in the photo at the right. 

This will keep the assembly straight.

□ 

4.  Turn the assembly over and install all ribs on the opposite side. 

Apply  finger  pressure  to  the  ribs  to  keep  the  assembly  flat  and 

make good contact with the parts.

□ 

5.  Assemble both stabilizer skins and sand out any irregularities. For the next step you will need some spring 

type cloths pins or other means of providing even pressure along both leading edge halves. Cloths pins work 

best.

□ 

6.  Use a straight edge or a straight board on the bench to butt the stabilizer skin up against for the next step. If 

you can just butt the assembly up against the straight edge and then bring it into contact with the skins the 

next step is much easier to do. Place one of the skins on the bench with the trailing edge butted up against 

the straight edge. Now apply aliphatic resin glue to all the ribs on one side of the stab assembly. Next apply 

a liberal bead of thick CA along the trailing edge. Flip the assembly over and but it up against the straight 

edge and then bring one half down into contact with the skin. Apply pressure until the CA sets and then rock 

the assembly over and apply pressure to the other half.

□ 

7.  Turn the assembly over immediately and repeat the process for the opposite side.

□ 

8.  Now apply a cloths pin about every inch along the leading edge check the assembly for straightness before 

the next step.

□ 

9.  Hold the assembly on end and apply thin CA to the leading edge at the tip. Allow it to run down the leading 

edge between the sheeting until it reaches the center. Now flip the assembly over and repeat the process for 

the other half. You can now glue the tip sections by just squeezing them together and applying CA. This 

concludes the assembly of the stab section. Trim and sand to finish.

Fin Assembly

□ 

1.  Use the same technique as the stabilizer, lay 

the core sheet flat on the bench and install all 

the split ribs on one side. Install the trailing 

edge with a straight edge as before. Trim the 

corners off of the leading edge of each rib to 

align  with  the  leading  edge  and  install  the 

leading edge.

Photo at right shows all fin components .

Summary of Contents for SHOESTRING

Page 1: ...TOP NOTCH PRODUCTS SHOESTRING Top Notch Products Company PO Box 1051 Goodlettsville TN 37070 Tel 615 866 4327 Fax 615 523 1154 Email tnproducts cs com www topnotchkits com ASSEMBLY MANUAL...

Page 2: ...his is because many of the internal parts require some movement of other parts to get tabs and slots into position Do not glue parts until directed to do so In the event that a part is missed you may...

Page 3: ...3 W4 W5 and W6 Tabs will engage it into rib W1 The 1 16 ply trailing edge keys into all wing ribs It must tip into rib W 7 then slide forward into remaining ribs Aileron bay trailing edge ABTE keys in...

Page 4: ...wing halves with the ply wing joiner rib Prop one wing tip up 4 at W12 for correct dihedral 21 Use one of the 1 64 ply spar joiners as a template to mark and remove the wing sheeting from the top and...

Page 5: ...tep If you can just butt the assembly up against the straight edge and then bring it into contact with the skins the next step is much easier to do Place one of the skins on the bench with the trailin...

Page 6: ...ns Note that the center lamination also contains a ply horn mount as did the elevator Here the second half of the split ribs are being added to the stabilizer core sheet Note that this part of the con...

Page 7: ...e two parts Note that the 1 4 20 blind nuts have been trimmed Here the fuselage construction has begun showing the laminated firewall lami nated F2 F2 A as well as the tank floor These components will...

Page 8: ...have a piece of 5 16 square stock to insert into the pushrod exit to help keep things aligned at the aft end There is a notch at the front that will engage a tab on the firewall assembly to align the...

Page 9: ...Next add CCL 2 to the bottom of this assembly Now add CCL 4 Trim this assembly until you get a reasonably good fit to the fuselage With this assembly in place on the fuselage add CCL 5 to the top of t...

Page 10: ...bolt plate assembly and the servo tray will square the entire fuselage as sembly when the tabs enguage the notches provided in the fuselage sides The hatch hold down block HH has been installed and i...

Reviews: