Tolis Group bruAPP Administrator'S Manual Download Page 48

offer warranty service for the same product model number, without voiding the warranty. Warranty 
terms, service availability, and service response times may vary from country/region to country/region. 
Standard warranty service response time is subject to change due to local parts availability. Your local 
TOLIS Group authorized service provider can provide you with details.

TOLIS Group is not responsible for any tariffs or duties that may be incurred in transferring the 
products. Transfer of the products may be covered by export controls issued by the United States or 
other governments.

This Limited Warranty applies only to TOLIS Group-branded hardware products (collectively referred to 
in this Limited Warranty as “TOLIS Group Hardware Products”) sold by or leased from TOLIS Group, 
Inc., its worldwide subsidiaries, affiliates, authorized resellers, or country distributors (collectively 
referred to in this Limited Warranty as “TOLIS Group”) with this Limited Warranty. The term “TOLIS 
Group Hardware Product” is limited to the hardware components and required firmware. The term 
“TOLIS Group Hardware Product” DOES NOT include any software applications or programs, non-
TOLIS Group products, or non-TOLIS Group branded peripherals.

All non-TOLIS Group products or non-TOLIS Group branded peripherals external to the TOLIS Group 
Hardware Product—such as external storage subsystems, displays, printers and other peripherals—are 
provided “AS IS” without TOLIS Group warranty. However, non-TOLIS Group manufacturers and 
suppliers or publishers may provide their own warranties directly to you.

TOLIS Group warrants that the TOLIS Group Hardware Products that you have purchased or leased 
from TOLIS Group are free from defects in materials or workmanship under normal use during the 
Limited Warranty Period. The Limited Warranty Period starts on the date of purchase or lease from 
TOLIS Group, or from the date TOLIS Group completes installation. Your dated sales or delivery 
receipt, showing the date of purchase or lease of the product, is your proof of the purchase or lease 
date. You may be required to provide proof of purchase or lease as a condition of receiving warranty 
service. You are entitled to hardware warranty service according to the terms and conditions of this 
document if a repair to your TOLIS Group Hardware Product is required within the Limited Warranty 
Period.

Unless otherwise stated, and to the extent permitted by local law, new TOLIS Group Hardware Products 
may be manufactured using new materials or new and used materials equivalent to new in performance 
and reliability. TOLIS Group may repair or replace TOLIS Group Hardware Products (a) with new or 
previously used products or parts equivalent to new in performance and reliability, or (b) with equivalent 
products to an original product that has been discontinued. Replacement parts are warranted to be free 
from defects in material or workmanship for ninety (90) days or, for the remainder of the Limited 
Warranty Period of the TOLIS Group Hardware Product they are replacing or in which they are installed, 
whichever is longer.

During the Limited Warranty Period, TOLIS Group will, at its discretion, repair or replace any defective 
component. All component parts or hardware products removed under this Limited Warranty become 
the property of TOLIS Group. In the unlikely event that your TOLIS Group Hardware Product has 
recurring failures, TOLIS Group, at its sole discretion, may elect to provide you with (a) a replacement 
unit of TOLIS Group

ʼ

s choosing that is the same or equivalent to your TOLIS Group Hardware Product 

in performance or (b) to give you a refund of your purchase price or lease payments (less interest) 
instead of a replacement. This is your exclusive remedy for defective products.

Exclusions

TOLIS GROUP DOES NOT WARRANT THAT THE OPERATION OF THIS PRODUCT WILL BE 
UNINTERRUPTED OR ERROR-FREE. TOLIS GROUP IS NOT RESPONSIBLE FOR DAMAGE THAT 
OCCURS AS A RESULT OF YOUR FAILURE TO FOLLOW THE INSTRUCTIONS INTENDED FOR 
THE TOLIS GROUP HARDWARE PRODUCT.

48

Summary of Contents for bruAPP

Page 1: ...ADMINISTRATORS GUIDE...

Page 2: ...2...

Page 3: ...out this manual trademarks are used TOLIS Group Inc states that we are using any and all trademarked names in an editorial fashion and to the benefit of the trademark owner with no intention of infrin...

Page 4: ...4...

Page 5: ...evices 13 Fibre Channel FC Tape Devices 13 5 Rack Installation 14 Identifying the Sections of the Rack Rails 14 Installing the Rear Inner Rails 14 Installing the Rack Rails 15 Installing the 1U 3U bru...

Page 6: ...Agent Configuration 31 BRU Server Daemon Restart 31 BRU Server License Version Information 31 Update License Information 32 Change Password 32 System Configuration Menu 32 bruAPP OS Update Check 33 br...

Page 7: ...re Warranty 47 Global Limited Warranty and Technical Support 47 Hardware Limited Warranty 47 General terms 47 Exclusions 48 Exclusive Remedy 49 Limitation of liability 49 Customer Responsibilities 50...

Page 8: ...8...

Page 9: ...upplied USB device excluding USB keyboards may damage the bruAPP Backup Appliance or bruAPP OS bruAPP OS USB Update Drive Do not connect the enclosed USB update drive on select models to the unit unle...

Page 10: ...stay in touch Again your business is very much appreciated and we look forward to serving you Contact TOLIS Group Inc General Inquiries TEL 480 505 0488 FAX 480 505 0492 E Mail bruinfo tolisgroup com...

Page 11: ...ranty card bruAPP hardware warranty BRU Server software support certificate Packing notices and additional notes as applicable Installation and use of the bruAPP Backup Appliance constitutes your agre...

Page 12: ...our bruAPP unit plug your keyboard and monitor mouse not required at least one network cable into GLAN0 Ethernet port closest to the monitor port and the power cord on the back panel as outlined in Fi...

Page 13: ...s a hardware refurbishment charge SCSI Tape Devices For SCSI devices you will need an LVD SE VHDCI Male to SCSI 3 MD68 Male cable to connect the SCSI tape device to the bruAPP Backup Appliance Fibre C...

Page 14: ...is hardware consists of two rear inner rails that secure to the chassis one on each side just behind the pre installed front inner rails Note that these two rails are left right specific Installing th...

Page 15: ...pter Do this by lining up the rear of the chassis rails with the front of the rack rails Slide the chassis rails into the rack rails keeping the pressure even on both sides you may have to depress the...

Page 16: ...g a component from the rack You should extend only one component at a time extending two or more simultaneously may cause the rack to become unstable Server Precautions Determine the placement of each...

Page 17: ...cal loading Circuit Overloading Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on ov...

Page 18: ...unit does not turn on check the switch on the power supply on the back of the unit and make sure that it is switched to the on position 1U Rackmount Systems For 1U rackmount systems that have a facepl...

Page 19: ...Front view for the bruAPP 3U chassis Power button and LEDs are on the lower left side of the chassis just under the rack handle All 3U systems utilize a hard drive carrier that inserts vertically ins...

Page 20: ...eapply the settings to the values that you set originally Network Setup The first part of the bruAPP OS setup is to configure the bruAPP network settings There are two Ethernet ports on the bruAPP You...

Page 21: ...Manual enter the IP address and network subnet mask that the ETH0 port will be using Press TAB or use the arrow up down keys to move between fields See figure 7 3 Once you ve entered the desired value...

Page 22: ...second network values you want to be used Apply Network Settings Once you have configured the settings for both Ethernet ports the bruAPP OS will now apply the settings creating the appropriate files...

Page 23: ...ed the time and date the bruAPP will set the system date and time based on the values you provided A dialog will appear to report what the current system time has been set to See figure 7 9 Automatica...

Page 24: ...desired NTP server If you choose to use the default option the server 0 pool ntp org will be used to set the system date and time For a complete list of time servers worldwide visit www ntp org Figur...

Page 25: ...ress ENTER to move to the next screen A test email will be sent to the email address using the existing Mail eXchange MX record for the domain used RAID Administrator SMTP Configuration This feature i...

Page 26: ...word correctly the first time If the first and second password entered do not match the process will need to be started over to enure that the password that gets set is intentional Password Security T...

Page 27: ...r various final operations Figure 7 13 BRU Server Hardware Scan completed dialog When the bruAPP has completed the reboot process your bruAPP Backup appliance is now ready to use Setup BRU Server Agen...

Page 28: ...of the bruAPP Support Information In case you need to contact TOLIS Group support and you don t have your Rolodex handy you can select this option to view the current TOLIS Group contact information...

Page 29: ...sk is not available bruAPP Stage Path The stage path for BRU Server on the bruAPP is usr bru server stage It should never be changed from that path Changing the BRU Server stage path on the bruAPP to...

Page 30: ...evices to the bruAPP a reboot of the bruAPP system is required in order for the bruAPP OS to properly see and use the device in BRU Server When running a hardware scan any backup or restore operations...

Page 31: ...vely you can use the IP address of 127 0 0 1 BRU Server Daemon Restart In the event that the BRU Server Server daemon needs to be restarted on the bruAPP under the BRU Server Main Menu the Restart opt...

Page 32: ...The names TOLIS Group Inc and Tolis Group Inc are not the same In figure 8 3 it shows an example license In the example license the Registered Owner field is bruAPP User When entering this it will not...

Page 33: ...nt that there s an update that has become available for your bruAPP OS you can download the updated version as well as any instructions on installing the update from the TOLIS Group website at http ww...

Page 34: ...onfigure option the make changes to the Ethernet settings DNS hostname Gateway IP and Subnet Mask bruAPP OS Network Test To assist in troubleshooting network issues on the bruAPP Backup Appliance ther...

Page 35: ...Server software can find the client machines that need to be backed up when BRU Server asks for the machine by name A number of other important factors apply with DNS and the bruAPP Network DNS test h...

Page 36: ...hot spare the unit will rebuild the RAID using level 5 with a hot spare The same applies for RAID 0 stripe RAID 5 RAID 6 and RAID 6 with hot spare At this time is it not possible to specify the RAID l...

Page 37: ...the spare is being returned to spare status No further action is required by you at this time Rebuild Informational The RAID has completed __ percent of the rebuild process Updates are periodically gi...

Page 38: ...igure 8 12 bruAPP RAID Alert message descriptions Colors in the priority field are the same colors used on the alert box displayed on the web interface In addition to these alerts the web interface wi...

Page 39: ...are no tape devices attached and therefore all backups Disk to Disk and Disk to Tape have been disabled The unit is now offline At this point the bruAPP Backup Appliance cannot perform backup operatio...

Page 40: ...ental erase of the bruAPP RAID array Warning DO NOT power off reset unplug or cut power to the bruAPP in any way when performing a rebuild of the RAID Doing so may leave the bruAPP in an unusable stat...

Page 41: ...or 6 bruAPP OS Date Time Settings The bruAPP OS can have the date and time set one of two ways The first is through manual operation of the System Time option or by using the Network Time Protocol NT...

Page 42: ...TP server choose the Sync Time option Viewing the Current System Time To view the current system time choose the Current Time option to view the current date and time of the bruAPP Backup Appliance Vi...

Page 43: ...roprietary property of TOLIS subject to protection under the intellectual property laws of the United States and those throughout the world Client agrees not to use or disclose the Software during and...

Page 44: ...reach of this Agreement In the event any portion of this Agreement is found to be illegal or unenforceable such portion shall be severed from this Agreement and the remaining terms shall be separately...

Page 45: ...________ _________ _________ _________ Subnet Mask ________ _________ _________ _________ System Hostname FQDN ____________________________________ Gateway IP ________ _________ _________ _________ D...

Page 46: ...ed LTO devices please review the LTO Tape and Drive Compatibility matrix figure 9 1 for LTO tape drive and LTO tape compatibility LTO 1 Drive LTO 2 Drive LTO 3 Drive LTO 4 Drive LTO 5 Drive LTO 1 Tape...

Page 47: ...F MERCHANTABILITY MERCHANTABLE QUALITY AND FITNESS FOR A PARTICULAR PURPOSE FOR ALL TRANSACTIONS OCCURRING IN THE UNITED STATES ANY IMPLIED WARRANTY OR CONDITION OF MERCHANTABILITY SATISFACTORY QUALIT...

Page 48: ...tes installation Your dated sales or delivery receipt showing the date of purchase or lease of the product is your proof of the purchase or lease date You may be required to provide proof of purchase...

Page 49: ...ED OR LEASED THESE TERMS AND CONDITIONS SUPERSEDE ANY PRIOR AGREEMENTS OR REPRESENTATIONS INCLUDING REPRESENTATIONS MADE IN TOLIS GROUP SALES LITERATURE OR ADVICE GIVEN TO YOU BY TOLIS GROUP OR AN AGE...

Page 50: ...ledge or in any way encumber or convey the Proprietary Service Tools In some cases TOLIS Group may require additional software such as drivers and agents to be loaded on your system in order to take a...

Page 51: ...required to return the defective unit back to TOLIS Group in the packaging that arrives with the replacement unit within a defined period of time normally seven 7 calendar days TOLIS Group will incur...

Reviews: