7
PREPARING THE LAND FOR THE INSTALLATION
The area has to be COMPLETELY HORIZONTAL; there can be no unevenness in the land. VERY IMPORTANT: Never install the
swimming pool on top of expanded polystyrene plaques or similar. Use gloves and glasses during the installation.
Prepare the area, previous to installation, as specified in the following segment:
To mark the area where the pool is going to be located you will need: A peg or stick, a rope, a funnel (or bottle) and lime, flour or
similar. For better safety, use gloves and glasses.
-
If you need to level the area or floor, do not refill the gaps. You have to remove soil from the more elevated areas of the
floor, to level them with the lower areas (and never the other way around), fig 1A. in any case, you will need to remove
roots, stones, grass and sharp objects.
-
With the help of a rake or board and a level, you will need to level off the ground and cover the gaps with sand.
-
With the help of a level and a strip of wood, check periodically that the ground is 100% leveled. Level the whole area at the
same level as the lowest area, fig 2.
fig. 1
fig. 2
Space required fig. 2:
Swimming pool: 550 x 366 x 132 - excavation: (X) length 610 x 518 width (Y)
Swimming pool: 640 x 366 x 132 - excavation: (X) length 700 x 518 width (Y)
Swimming pool: 730 x 366 x 132 - excavation: (X) length 790 x 518 width (Y)
Swimming pool: 915 x 457 x 132 - excavation: (X) length 975 x 610 width (Y)
COMPONENTS
Take out and classify all of the components of the swimming pool before starting the installation, if there is any components missing
within the assembly kit, you need to inform the after-sales service within 15 days after the purchase of the pool, otherwise the
guarantee will not cover this.
ASSEMBLY OF THE CENTRAL PILLAR
PRIOR TO THE ASSEMBLY
Very important:
Always use gloves to work. The installation must be done between at least 2 people.
a) Place the short U profile (5), with the open sides heading upwards, to continue, slide
the long U profile (4) on top of the short profile, with the open sides heading
downwards, in order to form a sort of box, make sure that the holes on both profiles
match, but do not screw them, fig.3.
b) Now situate the central pillar or column (3) on top of the two profiles, as shown on
fig. 4.
c) Situate the reinforcement plates (both right and left) (12)(13) at each side of the central
pillar (3) as shown on fig. 5, the reinforcement plates have to be situated under the U
profiles, use 3 screws (8) to hold the reinforcement plates.
d) All holes have to match in order to situate the 8 mm x12 cm Screws and the 8 mm
nuts(11). Make sure that the reinforcement (14) is situated on both sides of the
ensemble. Use the 8mm x11cm screws and 8mm nuts (15) to attach the upper side of
the reinforcement plates of the pillars (12) (13), fig.6.
e)
Once we have tightened all of the screws without forcing them, we have to situate the
guide rail connector (6) with one single screw (9), as seen in fig. 7. We call each of
these groups of united elements: modules
.
fig. 3