W W W . T M G I N D U S T R I A L . C O M
P 0 9 / 3 7
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
3.1.2 Installation equipment and tools
Installation equipment and tools
3.1.3 Inspection products
After receiving the product, please check the machine packaging,transport and wet
damage phenomenon, if shipping damage or soaked by rain, please don't open the
package, please contact the seller. Such as damage has been found in the packaging
but still unpacked, missing pieces or some parts can not be used and accidental injury
etc.,I will not bear any responsibility.
3.1.4 Unpacking
Check the packaging damage and the
rain and other damage phenomenon,
using the tool unpack the packing as
shown in Figure 5, please dispose of
packaging box, lest the environmental
pollution.
Check the condition of the machine,
in accordance with the packing list to
check if there is any damage or lost,
once found contact the dealer and
manufacture immediately. If you find
that the leakage but still installed, we
will not assume any responsibility. If
you have any questions, please do not use the machine, the supplier
contact.
3.2 Precautions during installation
All bolts must be tightened.
Power cord, no broken skin, no broken pipe, and other damage.
3.3 Main installation procedure
3.3.1 Standard configuration installation
The first step: unscrew wooden pallet fixing screws, tire changer placed at the
installation site, (installation site must conform to the requirements.
The second step: as shown in figure 6-a, unscrewing the 6 bolts from the box, the
column is installed in the machine box on the specified position, tighten the 6 bolts.
The third step: as shown in figure 6-b, after the installation of the column, such as
Figure5
Summary of Contents for TMG-TC24
Page 32: ......