W W W . T M G I N D U S T R I A L . C O M
P 1 0 / 3 7
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
the degree of tightness of the arm is not suitable, customers can adjust the tightness
of the elastic nut (according to the customer's own work effect, can not adjust)
The fourth step: as shown in the figure 6-c, ensure the machine source and
compressed air system is connected. * Note: prior to connect all the energy, ensure
the machine installation conditions conform to a uniform requirement.
The fifth step: as shown in Figure 6-d, stepping on the pedal which controls the
cylinder of pressing tire, the piston rod of the cylinder can be inserted.
The sixth step: as shown in figure 6-e, I the spade device is installed in the bearing,
the screw is inserted into the hole, do not use wrench to tighten the nut. II make the
cylinder piston rod go through the hole in the rotating pin, screw the nut, but do not
tighten.III The spring is hung at the point of the box body and the pressing-tire
spade.
The seventh step: as shown in figure 6-g, 6-f, tighten the screw on the pressing-tire
assembly device and the screw on the piston rod of pressing tire cylinder.
Figure6-a
Figure6-b
Figure6-c
Figure6-d
Figure6-e
Figure6-f
Figure6-g
Summary of Contents for TMG-TC24
Page 32: ......