12
4. Align ram and work piece to ensure center-loading. Do not overload work piece.
5.
5. Turn on the power, start the rotary switch (21), and operate the valve stem (30) to
left
as required to meet the
dressing, disassembly or assembly requirements.
Prior to operation:
1.Double check all hydraulic and electric connections.
2.Confirm that reservoir is filled with hydraulic fluid.
3.Put all equipment guards in place.
4.Clear all persons from work area.
5.Check for loose tools, equipment, or anything that might interfere with operation of equipment.
OPERATION:
1. Start Up – When initially starting unit up, be sure to jog the unit (intermittently run unit) several times. This will prime the
pump and fill the hydraulic lines.
CAUTION:
Check motor fan rotation at this time to avoid damaging pump or pump shaft seal.
2. After hydraulic lines have been filled, check reservoir for sufficient oil level. Replenish oil level if necessary.
6. When work is completed,
Turn the control stem to the right, to middle and then to
right
until ram is free from work
piece.
When the workpiece needs to hold pressure, turn the handle to the middle
position and turn off the power. Then turn the handle to Position A and B and
start the motor.
7. Once ram has fully retracted, remove workplace from bed frame.
Cautiously remove work piece from press.
8.
Turn off the power, turn the stem to the middle, and clean and
wipe the equipment.
WWW.TMGINDUSTRIAL.COM
P12/19
Toll Free:1-877-761-2819