13
4.
Turn set screw clockwise to remove saw rock on right front and left rear wheels.
5.
Turn set screw counter clockwise to remove saw rock on left front and right rear
wheels.
6.
Hold set screw in desire position and tighten jam nut.
11.
MAINTENANCE SCHEDULE
1.
Check all hardware after the first 5 hours of use, the follow the maintenance schedule.
2.
Re-torque the Blade and collar hardware after the first 25 hours of usage, and then
follow the maintenance schedule.
Maintenance
Each
use
Every
20 hours
Every
50 hours
Every
100 hours
Yearly
Engine
Refer to engine operator/owner
manual
X
X
Air Cleaner
Refer to engine operator/owner
manual
X
X
Oil
Oil change
X
Bearings
Grease Arbor Shaft Bearings
X
X
V-Belts
Check for excessive wear
X
X
Arbor
Recheck arbor-belt tension
X
Hardware
Check and tighten 1,2
X
X
X
Wheels
Grease wheels and check wear
X
X
Discount-Equipment.com