16) Install the lifting arms and arm restraint pins. The arm restraint pins must be installed
from the bottom of the mount. This will require removal of the handle, nut, lock washer,
flat washer, and gear block.
17) Adjust the arm lock gear and the arm lock until they mesh, then tighten the nut of the
arm lock.
18) Grease the (4) inside corners of each column to prevent premature wear of the nylon
slide blocks and also to ensure smooth operation of the lift.
19) Fill power unit reservoir with (10)quarts of premium quality ISO-32, AW-32, or AW-46
hydraulic oil only. Be sure to periodically check dipstick to prevent spillage.
NOTE:
This is
a good time to check if all fittings on the lift are tightened properly.
20) Press and hold power button on motor to operate lift. Raise carriages all the way to the
top of the lift, then lower carriages down to the ground to bleed air from the hydraulic
system prior to adjusting cable tension.
NOTE:
Cables must be adjusted so that the
safety locks engage simultaneously prior to lifting any weight.
Use 5/8” wrench to
tighten the nut.
Lock the nut.
Arm lock
Arm lock gear
Summary of Contents for HD2P-9KCL
Page 25: ...22 FIG 2 HD2P 9KCL Column Anchor Bolts 3 4 5 50 Column 4 Concrete 3000PSI min Torque Nut...
Page 27: ...24...
Page 36: ......
Page 37: ...NOTES...
Page 38: ...NOTES...
Page 39: ...NOTES...