3) Make sure that the turnstile installation area is ready as follows:
The installation site surface to be flat and horizontal;
Thickness of concrete blinding coat under site to be at least 150 mm.
4)
5)
6)
а
)
С
ENTURION-
М
2.2.
5
Installation procedure
The turnstile installation procedure is as follows
:
1)
The package integrity to be checked prior to unpacking. If package is damaged, then
damages to be fixed (picture to be taken, damage report to be made).
2)
The turnstiled to be unpacked and inspected for defects and damages as well as
completeness to be checked according to the turnstile data sheet;
WARNING
:
When the turnstile damages are detected or in case of shortage of
delivery, installation work to be stopped and the turnstile supplier to be
referred to
.
The turnstile fixation holes to be marked on the area surface according to
Fig. 12
.
The turnstile itself can be used as a template, when installed upright on installation site.
The relevant holes to be drilled on the surface according to the marking due to diameter of
anchors (12×120М10) for the turnstile fixation.
A
nchor
j
ackets to be inserted into the
p
re
p
ared holes.
When cables to be laid under the floor surface, then a cable duct to be prepared in the floor
leading to the turnstile rack cable entry area. The cable entry area layout is shown in Fig.1
3
diagram.