PUF+ Operator’s Manual
Tisch Environmental
12
Step by Step: Installing the Gable Roof Assembly
The Gable Roof is shipped uninstalled to prevent damage that could occur in shipping and
must be installed by the user when first setting up the unit.
A bag of parts is shipped tapped to the inside of the lid and contains the
following:
•
5 pcs 10-24
x
1/2 pan head screws
•
5 pcs 10-24 stop nuts
•
1 pc 6-32 x 3
/
8 pan head screw
•
1 pc 6-32 hex nut
•
1 pc 20" chain with" S" hook
•
1 pc TE-5001-1O-9 roof back catch
•
1 pc TE-5001-1O-1O front catch
•
1
pc TE-5001-1O-11 rear lid hasp
Installation:
1. Secure TE-500l-1O-1O front catch to the shelter using 2 10-24 pan head screws with
stop nuts.
2. Secure TE-5001-10-9 roof back catch to the back of shelter using 10-24 pan head
screw with stop nut.
3.
Secure TE-5001-1O-11 rear lid hasp inside the lid with the slotted end angled up
using 2 -
10-24 pan head screws with stop nuts.
Note: These three items may need adjustment after the shelter lid is installed.
4.
R
emove 4 -10-24 x 1/2 pan head screws from the nutserts in back of shelter.
5. Attach the lid to the shelter by placing the lid hinge plates on the "OUTSIDE" of the
shelter top and tighten the 4 - 10-24 x 1/2 pan head screws into the nutserts.
6. Adjust the front catch to be sure that the lid slot lowers over it when closing the lid.
The rear li
d
hasp should align with the roof back catch when the lid is open.
7. Attach the chain and "S" hook assembly to the side of the shelter with a 6-32 pan
head
screw
and nut.
8.
The
lid can now be
secured
in an open or closed position with the "S" hook
.
Step by Step: Setting the Date and Time
The following steps provide instructions for setting the date and time.
1. From the Main Status Screen, press “F3” key to enter the SETUP menu.
2. Scroll using the arrow keys and select the CONFIGURE menu item and press the
“ENT” key.
Summary of Contents for PUF+
Page 1: ...PUF Operator s Manual Date 3 18 2008...
Page 2: ......
Page 4: ......
Page 6: ......
Page 9: ...Tisch Environmental PUF Operator s Manual 5...
Page 10: ......
Page 30: ......
Page 32: ......
Page 34: ......