background image

Installation on opened central heating system

 

One of the possible installation processes is shown in Figure 9.

 

With  this  system,  on  the  initial  line  are  being  set    safety  distribution  line  of  the  expansion 
vessel and boiler's valve, and on the initial line of the system are being set boiler's valve, a 
pump and a valv. Directly below the open expansion vessel is set short connection between 
safety distribution line and safety rebound line, which prevents water freezing on winter in an 
expansion vessel.

 

On safety distribution line and safty rebound line, must not be any kind of fitting. Expansion 
vessel  must  have  an  overflow  pipe  as  shown  on  the  chart  in  Figure  9.  The  volume  of  the 
expansion vessel is calculated by the folloving formula:

 

V = 0,07xVwater,  (l), where Vwater is volume of the water in entire system.

 

 

Open expansion vessel is placed vertically above the highest heating body. Under the open 
heating system is possible having gravitational heating system.

 

 

Note:  Installation  of  the  heating  system  and  starting  up  of  the  entire  system  should  be 
entrusted exclusively to professional service in charge that guarantees the correct operation 
of the entire heating system. In case of bad design of the system and possible shortcomings 
while  installing  it  by  the  entity  that  did  the  work,  complete  material  responsibility  takes  the 
person  to  whom  was  entrusted  installation  of  heating  systems,  and  not  a  producer, 
rappresentative or seller of the boiler.

 

 

Important notice

 

 

•  Installation  of  the  stove  should  be  done  by  qualified  person  according  to  an  appropriate 
project. Construction of the stove allows you to connect it either to indoor or outdoor heating 
system.  All  connections  must  be  well  sealed  and  fastened.  Prior  to  starting  it  up,  the 
complete installation must be tested with water at a pressure of 3 bar.

 

 

• When  installing  the  safety  valve,  please  pay  attention  to  the  direct  connection  with  water 
pipes and sewer, and that valves (faucets)  always stay open.

 

 

• If using a reinforced hose to connect to the drainage, it must be placed away from the back 
side of the cooker.

 

 

With first ignition is necessary to examine the the proper functioning of the valve by doing the 
following: overheating it up to 100 ° C on short-term basis, examining the proper function of 
draft regulator and installing hot water distribution connection up to radiators and directly to 
radiators. 
 

Summary of Contents for NIKA- HYDRO

Page 1: ...NIKA HYDRO Fireplace stove on solid fuel Owners s manual INSTALATION ADJUSTMENT AND OPERATING INSTRUCTION EN 13240...

Page 2: ...our stove Keep it handy and refer to it as needed You will find in it information that will be useful now and in the years to come Make sure that when installing the stowe all security standards have...

Page 3: ...Bookmark not defined INSTALLING THE STOVE INTO THE SYSTEM FOR WATER HEATING Error Bookmark not defined Installaion on closed central heating system Error Bookmark not defined Installaion on opened cen...

Page 4: ...g it Do not allow children to handle and play near the stove Only spare partes reccomended and allowed by the manufacturer should be installed on the stove You must not make any changes on the stove W...

Page 5: ...The upper plate of the fireplace is made of steal figure 1 position 1 Firebox doors figure 1 position 4 are made of cast iron with fireproof glass Connection for smoke drain figure 1 position 2 is mad...

Page 6: ...entral on upper plate Consuption by nominal power kg h 2 65 Emission temperature C 241 Air regulation Primary Automatski Rathgeber Secundary Manual Required amount of water in the boiler l 12 5 Requir...

Page 7: ...eeply into the chimney that would reduce the cross sectional area and thus undermined draft in the chimney Do not use reducers which reduce the cross section of pipe smoke The stove requires insertion...

Page 8: ...raft in the chimney Figure 3a check the chimney functioning The chimney should be located inside the building and if it s located on the external walls of the building it s highly recommended insulati...

Page 9: ...ut 2 Excessive slope 3 A sudden change of direction of the channel 4 Stove or some other evice is connected to the same flue channel 5 Bulges in the channel 6 Cracks 7 Alien body or acumulated grime 8...

Page 10: ...must wait until entire amount of a fuel lightens up and only then reduce draft on half when adding fuel open the firebox door for just few degrees wait for 4 5 seconds and then slowly open them wide D...

Page 11: ...inserted only after the previous volume burn Do not allow that ashes and unburned accumulate on the grid and to ta pit that way Clean the grid Open the door slowly and carefully allowing that way equa...

Page 12: ...clean the rost grid in order to provide the fresh air supply Regularly clean the ash tray making sure that there is always enough place for ashes The stove is designed to operate in periodic mode To...

Page 13: ...ulation of secondary air Secondary air regulator put into position open Figure 7a during firing and keep in this position until establishing the stable operation of the stove after loading some larger...

Page 14: ...ed to 4 bar The connecting line of the safety valve must be as short as possible and must not have the possibility of closing In this connecting line also there must not be any single valve or any oth...

Page 15: ...Figure 8 closed central heating system...

Page 16: ...ional service in charge that guarantees the correct operation of the entire heating system In case of bad design of the system and possible shortcomings while installing it by the entity that did the...

Page 17: ...Figure 9 Open central heating system...

Page 18: ...eaning use protective gloves Clean the bottom of the ovenfrom accumulated ash and pick up small unburned pieces of the grid clean the ashtray and ash accumulated in the interior of the fireplace Clean...

Page 19: ...ke reenters into a room Closed regulator of air supply Insufficient draft Remainings of ashes on a grid Open the regulator of air supplyand provide a supply of a primary air Read carefully the instruc...

Page 20: ...the manufacturer s service only If unauthorized persons carry out any servicing or repairs and alterations to the stove the owner loses the right to the manufacturer s warranty Supply of spare parts h...

Page 21: ...is forbiden burning an inorganic and organic materials plastics plywood textile oiled wood etc because the combustion releases carcinogenic materials and other toxics FIREPLACE SOLID FUEL STOVE NIKA H...

Page 22: ...cleaner structure 12 Authomatic regulation of a primar air 13 Pin 14 The base structure 15 Grid 16 Lever 17 Ashtray 18 Firebox door 19 Firebox door handle 20 Firebox door glass 21 Secondary air handl...

Page 23: ...Dimensions of the stove...

Page 24: ...the seller Detail protocol must be released by the offitial seller of TIM SISTE product This warranty will be accepted only if Product has been used according to this manual Product is not fisicaly d...

Page 25: ...___________________________ __________________________________________________________________________ __________________________________________________________________________ ______________________...

Page 26: ......

Page 27: ......

Page 28: ...TIM SISTEM d o o Prva industrijska 9 22330 Nova Pazova Serbia tel 381 22 328 076 e mail office timsistem rs www timsistem rs...

Reviews: