![Tigo TSS-50-US Installation And Operation Manual Download Page 9](http://html1.mh-extra.com/html/tigo/tss-50-us/tss-50-us_installation-and-operation-manual_1115959009.webp)
9 |
P a g e
Tigo Energy, Inc.
|
www.tigoenergy.com
|
Tools & Items Needed for Installation
Table 2 Required Tools
Item
Needed for:
3/16”
(5mm) Philips screwdriver Removing/replacing covers, terminating conductors
Pencil
Marking drill holes
Level
Mounting the equipment
Drill & 8mm drill bit*
Drilling pilot holes for mounting. *Bit size will depend on
the mounting surface material and anchor sizes required.
Wire cutter/crimping tool
Crimping wire ferrules, O-type terminal and wire
preparation
Rubber mallet/hammer
Making sleeve anchors flush with wall
EI ATS Overview
Left side
Front
Right side
Bottom
Figure 3 ATS Enclosure Overview
1)
Mounting bracket
2)
1-
1/4” knockout
3)
Front door
4)
Door locks
5)
1-
1/4” knockout
6)
1” backup
load knockout
7)
1” inverter
knockout
8)
1” grid knockout