![Tigo TSS-50-US Installation And Operation Manual Download Page 12](http://html1.mh-extra.com/html/tigo/tss-50-us/tss-50-us_installation-and-operation-manual_1115959012.webp)
12 |
P a g e
Tigo Energy, Inc.
|
www.tigoenergy.com
|
Installation
Caution
For personal safety always wear appropriate PPE and use all safety precautions
suitable for the working environment, including the use of insulated tools.
Note:
All electrical installations must be completed in accordance with all local
electrical codes and the National Electric Code, NFPA 70 (NEC). For installation
in Canada the installations must be completed in accordance with applicable
Canadian standards. Before connecting the inverter to the power distribution
grid, contact your local electric utility company. These connections may only be
made by qualified personnel.
Installation requirements
The ATS installation must comply with the following requirements.
▪
Select a wall or solid vertical surface that can support the EI ATS.
▪
Select a well-ventilated location sheltered from direct sunlight and rain.
▪
Do not install the ATS on structures constructed of highly flammable materials.
▪
The humidity at the installation location must be 0-100% without condensation.
▪
The installation location shall always be accessible.
▪
Mount the ATS vertically. Do not install horizontal, tilting forward, sideways or facing
upside down.
▪
Ensure the ATS is out of reach of children.
▪
Do not cover or place items on the ATS.
▪
Do not install in locations with strong electromechanical interference, and away from
any antennas.
The minimum clearances shown below must be observed.
Figure 9 Clearances