![Tigo TSS-50-US Installation And Operation Manual Download Page 8](http://html1.mh-extra.com/html/tigo/tss-50-us/tss-50-us_installation-and-operation-manual_1115959008.webp)
8 |
P a g e
Tigo Energy, Inc.
|
www.tigoenergy.com
|
Transportation and Storage
When possible, transport the ATS in the original packaging, facing up and do not expose to
inclement weather or unnecessary shocks and vibrations. If the original packaging cannot be
used, a box of similar size, without damage, and can accommodate the weight of the ATS. Take
precaution to ensure the packaging is fully closed and reasonably weather tight.
To store the ATS, select a dry environment with ambient temperatures of -13°F to 122°F (-25°C
–
50°C).
Understanding this Document
This manual includes installation references to three separate components of the complete
Energy Intelligence Residential Solution: inverter, battery, and ATS. Each of these components
(and more) are necessary for the proper operation of the EI Battery system.
Installation of the equipment can take place concurrently, although the EI Inverter is the hub of
all equipment in this system. Where a workstream can split off from the main efforts of ATS
installation, a QR code will be provided directing to the appropriate product
’s documentation
.
Pre-Installation
When receiving delivery of the EI ATS, examine the packaging for damage. If the packaging
appears to have damage through the box and into the contents, refuse delivery and notify the
vendor immediately. If damage appears external only, open the box and inspect for any product
damage and/or missing parts.
EI ATS Package Contents
Open the package and inspect the contents. The following components should be included. If
anything is missing, please contact the vendor immediately.
Figure 2 Package contents
In
sta
lla
tio
n
A
B
C
D
E
F
G
H
Table 1 Package list
Item
Description
Quantity
A
ATS
1
B
Quick Stary Guide
1
C
Sleeve anchor
3
D
Keys
2
E
Safety-lock screws
2
F
O-type terminal
3
G
Wire ferrules
8
H
Mounting bracket
1