ASSEMBLY
Assembly Section 2-27
MAIN BOOM:
“A” Port, Boom UP:
7-9 Seconds
(Note: Extend secondary boom completely; roll deck to be level with ground, and lower main
boom until deck is on ground. Now index main boom “up” function and determine the time
required for main boom to rise completely.)
“B” Port, Boom Down:
6-8 Seconds
(Note: Extend secondary boom completely, roll deck to be level with ground, and raise the main
boom to “full up”. Then index the main boom “down” function to determine the amount of time
required for the deck to contact the ground. CAUTION: Stop the boom just as the deck contacts
the ground.)
SECONDARY
BOOM
:
“A” Port, Boom Out:
8-10 Seconds
(Position main boom full up, roll deck out until deck cylinder is fully retracted, and bring
secondary boom in completely. Then index the secondary boom “out” function and determine the
time required for boom to extend out completely.)
“B” Port, Boom In:
8-10 Seconds
(Position the main boom full up, roll deck out until deck cylinder is fully retracted, and extend
secondary boom completely. Then index the secondary boom “in” function and determine the
time required for boom to come in.)
DECK ROLL:
“A” Port, Deck Out: 7-9 Seconds
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be articulated
without contacting the main boom, and roll deck in until deck cylinder is completely extended.
Then index the deck roll “out” function and determine the time required for the deck to roll out.)
“B” Port, Deck In: Target 7-9 Seconds (but DO NOT use Limit Screw)
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be articulated
without contacting the main boom, and roll deck out until deck cylinder is completely retracted.
Then index the deck roll “in” function and determine the time required for the deck to roll in.)
BOOM
SWIVEL:
“
A” Port, Boom Aft:
14-16 Seconds
(Extend booms completely; rotate head to be level with ground, lower main boom until deck is
just above ground, and swivel boom full forward. Then index the boom swivel “aft” function and
determine the time required for the boom to swivel aft. Use caution when doing this, stop boom
before main boom contacts tire.)
“B” Port, Boom Forward:
14-16 Seconds
(Extend booms completely, rotate head to be level with ground, lower main boom until deck is just above
ground, and swivel boom aft and until near tire. Then index the boom swivel “forward” function and
determine the time required for the boom to swivel full forward.
)
Summary of Contents for BENGAL BRUTE JD 62-6420 CAB
Page 4: ......
Page 6: ......
Page 7: ...SAFETY SECTION Safety Section 1 1 ...
Page 24: ...Safety Section 1 18 SAFETY 33743 INSIDE OF CAB 06550012 INSIDE OF CAB PART NO LOCATION ...
Page 29: ...Safety Section 1 23 SAFETY 34852 HYDRAULIC TANK TB1011 MOWER DECK ...
Page 32: ...Safety Section 1 26 SAFETY ...
Page 33: ...Assembly Section 2 1 ASSEMBLY SECTION JD6X20 BENGAL BRUTE ...
Page 51: ...ASSEMBLY Assembly Section 2 19 ASM C 0094 ...
Page 60: ...ASSEMBLY Assembly Section 2 28 ASM DF CALIBRATION LRS 0001 ...
Page 62: ...ASSEMBLY Assembly Section 2 30 ...
Page 63: ...Operation Section 3 1 2011 Alamo Group Inc OPERATION SECTION ...
Page 108: ...OPERATION Boom Operation Section 3 46 2011 Alamo Group Inc OPERATION ...
Page 109: ...Maintenance Section 4 1 2011 Alamo Group Inc MAINTENANCE SECTION ...
Page 116: ...MAINTENANCE Boom Maintenance Section 4 8 2011 Alamo Group Inc MAINTENANCE ...
Page 137: ...MAINTENANCE Boom Maintenance Section 4 29 2011 Alamo Group Inc MAINTENANCE ...
Page 139: ...PARTS SECTION JD6X20 BENGAL BRUTE BOOM ...
Page 140: ...NOTES ...
Page 142: ...PARTS ORDERING GUIDE 2012 Alamo Group Inc Parts Section 5 4 JD6X20 BENGAL BRUTE ...
Page 143: ...NOTES 2012 Alamo Group Inc Parts Section 5 5 JD6X20 BENGAL BRUTE ...
Page 146: ...TRACTOR MOUNT KIT HYDRAULICS 2012 Alamo Group Inc Parts Section 5 8 JD6X20 BENGAL BRUTE ...
Page 148: ...CABLE CONTROL MOUNTING 2012 Alamo Group Inc Parts Section 5 10 JD6X20 BENGAL BRUTE ...
Page 150: ...CABLE MANUAL LIFT VALVE 4 SPOOL 2012 Alamo Group Inc Parts Section 5 12 JD6X20 BENGAL BRUTE ...
Page 152: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2012 Alamo Group Inc Parts Section 5 14 JD6X20 BENGAL BRUTE ...
Page 154: ...JOYSTICK AND SWITCH BOX MOUNTING 2012 Alamo Group Inc Parts Section 5 16 JD6X20 BENGAL BRUTE ...
Page 162: ...SAFETY LIGHT OPTION 2012 Alamo Group Inc Parts Section 5 24 JD6X20 BENGAL BRUTE ...
Page 164: ...SOLENOID VALVE SWITCH AND WIRING 2012 Alamo Group Inc Parts Section 5 26 JD6X20 BENGAL BRUTE ...
Page 167: ...SWITCH BOX SCHEMATIC 2012 Alamo Group Inc Parts Section 5 29 JD6X20 BENGAL BRUTE ...
Page 168: ...NOTES 1 2012 Alamo Group Inc Parts Section 5 30 JD6X20 BENGAL BRUTE ...
Page 169: ...COMMON LEGAL REAR STOW PARTS SECTION Common Section 6 1 ...
Page 170: ...NOTES ...
Page 173: ...PARTS ORDERING GUIDE 2011 Alamo Group Inc Parts Section 6 5 COMMON LRS ...
Page 174: ...NOTES 2011 Alamo Group Inc Parts Section 6 6 COMMON LRS ...
Page 176: ...LEGAL REAR STOW BOOM ASSY 2011 Alamo Group Inc Parts Section 6 8 COMMON LRS ...
Page 178: ...LEGAL REAR STOW BOOM HYD ASSY 2011 Alamo Group Inc Parts Section 6 10 COMMON LRS ...
Page 180: ...BOOMREST BENGAL BRUTE 2011 Alamo Group Inc Parts Section 6 12 COMMON LRS ...
Page 182: ...BOOMREST PANTHER 2011 Alamo Group Inc Parts Section 6 14 COMMON LRS ...
Page 184: ...LEGAL REAR STOW RTRY PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 16 COMMON LRS ...
Page 186: ...LEGAL REAR STOW FLAIL PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 18 COMMON LRS ...
Page 196: ...50IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 28 COMMON LRS ...
Page 200: ...50IN FLAIL MOWER ASSY PASS THROUGH KNIVES 2011 Alamo Group Inc Parts Section 6 32 COMMON LRS ...
Page 202: ...63IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 34 COMMON LRS ...
Page 204: ...63IN FLAIL MOWER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 36 COMMON LRS ...
Page 211: ...NOTES 1 2011 Alamo Group Inc Parts Section 6 43 COMMON LRS ...
Page 212: ...COOLER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 44 COMMON LRS ...
Page 214: ...ROTARY MOWER SPINDLE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 46 COMMON LRS ...
Page 222: ...FRONT HYDRAULIC PUMP 2011 Alamo Group Inc Parts Section 6 54 COMMON LRS ...
Page 224: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 56 COMMON LRS ...
Page 226: ...50IN AND 63IN FLAIL MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 58 COMMON LRS ...
Page 229: ...MANUAL LIFT VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 61 COMMON LRS ...
Page 231: ...ELECTRONIC LIFT VALVE SCHEMATIC REAR STOW 2011 Alamo Group Inc Parts Section 6 63 COMMON LRS ...
Page 232: ...ELECTRONIC LIFT VALVE WIRING DIAGRAM 2011 Alamo Group Inc Parts Section 6 64 COMMON LRS ...
Page 234: ...SELECTOR VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 66 COMMON LRS ...
Page 236: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2011 Alamo Group Inc Parts Section 6 68 COMMON LRS ...
Page 237: ...HYDRAULIC TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 69 COMMON LRS ...
Page 238: ...ELECTRICAL TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 70 COMMON LRS ...
Page 239: ...TROUBLESHOOTING 2011 Alamo Group Inc Parts Section 6 71 COMMON LRS ...
Page 240: ...TROUBLESHOOTING CONTINUED 2011 Alamo Group Inc Parts Section 6 72 COMMON LRS ...
Page 241: ...CLEAN CUTTER HEAD 2011 Alamo Group Inc Parts Section 6 73 COMMON LRS ...
Page 242: ...CLEAN CUTTER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 74 COMMON LRS ...
Page 243: ...CLEAN CUTTER OPERATION 2011 Alamo Group Inc Parts Section 6 75 COMMON LRS ...
Page 244: ...CLEAN CUTTER OPERATION CONTINUED 2011 Alamo Group Inc Parts Section 6 76 COMMON LRS ...
Page 245: ...CLEAN CUTTER MAINTENANCE 2011 Alamo Group Inc Parts Section 6 77 COMMON LRS ...
Page 247: ...CARBIDE TIP REPLACEMENT 2011 Alamo Group Inc Parts Section 6 79 COMMON LRS ...
Page 248: ...NOTES 2 2011 Alamo Group Inc Parts Section 6 80 COMMON LRS ...
Page 249: ...FIRE SUPRESSION SYSTEM 2011 Alamo Group Inc Parts Section 6 81 COMMON LRS ...
Page 250: ...FIRE SUPRESSION SYSTEM PARTS 2011 Alamo Group Inc Parts Section 6 82 COMMON LRS ...
Page 253: ...WETCUT 2011 Alamo Group Inc Parts Section 6 85 COMMON LRS ...
Page 256: ...WETCUT TANK PLUMBING 2011 Alamo Group Inc Parts Section 6 88 COMMON LRS ...
Page 258: ...WETCUT SPRAYER HEAD ASSEMBLY 2011 Alamo Group Inc Parts Section 6 90 COMMON LRS ...
Page 260: ...WETCUT CABLES 2011 Alamo Group Inc Parts Section 6 92 COMMON LRS ...
Page 261: ...WARRANTY SECTION Warranty Section 7 1 ...
Page 262: ... ...
Page 266: ...Printed in USA Tiger Corporation ...