ASSEMBLY
Assembly Section 2-22
SWIVEL BRACKET MOUNTING
Install the boom swivel bracket onto the boom mounting bracket with the swivel pin. Secure
the pin in place using the capscrews, etc. through the hole in the boss and pin. NOTE: The head
of the capscrew must be toward the front of the tractor.
Install all new swivels and fittings on the swing cylinder with swivel openings facing each
other. Fittings will vary in type and direction depending on your application, refer to your parts
section for more details.
Install bearings in the main frame anchor for the swing cylinder. This may already be done
for you.
Install the swing cylinder between the boom mounting bracket cylinder anchor and the boom
swivel with the pins. Insert roll pins through the top and the bottom hole in the pins.
Now the hoses can be attached from the control valve to the swing cylinder.
(ASM-C-0015)
PREFORMED TUBE INSTALLATION
Lay booms on floor so the side with the nuts welded on is up. If mounting a ditcher head,
only the main boom tube installation is required. Locate all tube clamps and install them loosely
in the welded nuts on the left side of the booms.
Arrange the tubes and hoses as outlined in the parts section diagram. Install the smaller tube
closest to the boom arm, being careful not to pinch the tubes. Place the large tubes outside of
the small tubes. Snug all clamp bolts, but do not tighten. Check all tubes for correct alignment
and that none are pinched or bent. The clamp bolts can now be tightened.
(ASM-C-0016)
MAIN BOOM INSTALLATION
Install the boom swivel into the main frame as shown in the parts section using a hoist. Line up holes
in swivel and main frame for large swivel pin and insert pin. Secure with hardware as shown.
Attach the inner end of the main boom to the swivel bracket with the cylinder anchors positioned
upward, and at a right angle to the tractor. Secure it with the horizontal hinge pin. Secure the hinge pin in
the boss with capscrews, etc. (see Parts Section).
Attach the butt end of the main boom cylinder to the swivel with the cylinder pin and roll pins shown in
the Parts Section.
Install the travel lock on the rod end of the main boom cylinder. This should be facing the butt end of
the cylinder after installation.
Install the fittings and hoses to the main boom cylinder per Parts Section.
GREASE HINGE PIN ZERKS ON BOOM AFTER ASSEMBLY, ONCE UNDER LOAD WITH BOOM
ELEVATED AND AGAIN AT REST WITH BOOM SUPPORTED
(ASM-C-0013)
SWITCHING SIDE MOUNT TO BOOM ARM
If you are changing over from a side mounted mower you must first close the ball valves and
remove the motor hoses from the motor to the solenoid valve. Also remove and replace any
fittings that do not match the ones shown in the parts section diagram.
Next, disconnect all hoses from the control valve. Remove the pin that connects the lift
cylinder to the mast on the main frame. Remove the inner draft beam pin.
At this point the mower should be loose from the tractor.
Remove the two spool valve and mount the four spool valve for the boom according the
diagram in the parts section. Also refer to the parts section for the new hoses that will need to be
used.
(ASM-C-0020)
Summary of Contents for BENGAL BRUTE JD 62-6420 CAB
Page 4: ......
Page 6: ......
Page 7: ...SAFETY SECTION Safety Section 1 1 ...
Page 24: ...Safety Section 1 18 SAFETY 33743 INSIDE OF CAB 06550012 INSIDE OF CAB PART NO LOCATION ...
Page 29: ...Safety Section 1 23 SAFETY 34852 HYDRAULIC TANK TB1011 MOWER DECK ...
Page 32: ...Safety Section 1 26 SAFETY ...
Page 33: ...Assembly Section 2 1 ASSEMBLY SECTION JD6X20 BENGAL BRUTE ...
Page 51: ...ASSEMBLY Assembly Section 2 19 ASM C 0094 ...
Page 60: ...ASSEMBLY Assembly Section 2 28 ASM DF CALIBRATION LRS 0001 ...
Page 62: ...ASSEMBLY Assembly Section 2 30 ...
Page 63: ...Operation Section 3 1 2011 Alamo Group Inc OPERATION SECTION ...
Page 108: ...OPERATION Boom Operation Section 3 46 2011 Alamo Group Inc OPERATION ...
Page 109: ...Maintenance Section 4 1 2011 Alamo Group Inc MAINTENANCE SECTION ...
Page 116: ...MAINTENANCE Boom Maintenance Section 4 8 2011 Alamo Group Inc MAINTENANCE ...
Page 137: ...MAINTENANCE Boom Maintenance Section 4 29 2011 Alamo Group Inc MAINTENANCE ...
Page 139: ...PARTS SECTION JD6X20 BENGAL BRUTE BOOM ...
Page 140: ...NOTES ...
Page 142: ...PARTS ORDERING GUIDE 2012 Alamo Group Inc Parts Section 5 4 JD6X20 BENGAL BRUTE ...
Page 143: ...NOTES 2012 Alamo Group Inc Parts Section 5 5 JD6X20 BENGAL BRUTE ...
Page 146: ...TRACTOR MOUNT KIT HYDRAULICS 2012 Alamo Group Inc Parts Section 5 8 JD6X20 BENGAL BRUTE ...
Page 148: ...CABLE CONTROL MOUNTING 2012 Alamo Group Inc Parts Section 5 10 JD6X20 BENGAL BRUTE ...
Page 150: ...CABLE MANUAL LIFT VALVE 4 SPOOL 2012 Alamo Group Inc Parts Section 5 12 JD6X20 BENGAL BRUTE ...
Page 152: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2012 Alamo Group Inc Parts Section 5 14 JD6X20 BENGAL BRUTE ...
Page 154: ...JOYSTICK AND SWITCH BOX MOUNTING 2012 Alamo Group Inc Parts Section 5 16 JD6X20 BENGAL BRUTE ...
Page 162: ...SAFETY LIGHT OPTION 2012 Alamo Group Inc Parts Section 5 24 JD6X20 BENGAL BRUTE ...
Page 164: ...SOLENOID VALVE SWITCH AND WIRING 2012 Alamo Group Inc Parts Section 5 26 JD6X20 BENGAL BRUTE ...
Page 167: ...SWITCH BOX SCHEMATIC 2012 Alamo Group Inc Parts Section 5 29 JD6X20 BENGAL BRUTE ...
Page 168: ...NOTES 1 2012 Alamo Group Inc Parts Section 5 30 JD6X20 BENGAL BRUTE ...
Page 169: ...COMMON LEGAL REAR STOW PARTS SECTION Common Section 6 1 ...
Page 170: ...NOTES ...
Page 173: ...PARTS ORDERING GUIDE 2011 Alamo Group Inc Parts Section 6 5 COMMON LRS ...
Page 174: ...NOTES 2011 Alamo Group Inc Parts Section 6 6 COMMON LRS ...
Page 176: ...LEGAL REAR STOW BOOM ASSY 2011 Alamo Group Inc Parts Section 6 8 COMMON LRS ...
Page 178: ...LEGAL REAR STOW BOOM HYD ASSY 2011 Alamo Group Inc Parts Section 6 10 COMMON LRS ...
Page 180: ...BOOMREST BENGAL BRUTE 2011 Alamo Group Inc Parts Section 6 12 COMMON LRS ...
Page 182: ...BOOMREST PANTHER 2011 Alamo Group Inc Parts Section 6 14 COMMON LRS ...
Page 184: ...LEGAL REAR STOW RTRY PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 16 COMMON LRS ...
Page 186: ...LEGAL REAR STOW FLAIL PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 18 COMMON LRS ...
Page 196: ...50IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 28 COMMON LRS ...
Page 200: ...50IN FLAIL MOWER ASSY PASS THROUGH KNIVES 2011 Alamo Group Inc Parts Section 6 32 COMMON LRS ...
Page 202: ...63IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 34 COMMON LRS ...
Page 204: ...63IN FLAIL MOWER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 36 COMMON LRS ...
Page 211: ...NOTES 1 2011 Alamo Group Inc Parts Section 6 43 COMMON LRS ...
Page 212: ...COOLER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 44 COMMON LRS ...
Page 214: ...ROTARY MOWER SPINDLE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 46 COMMON LRS ...
Page 222: ...FRONT HYDRAULIC PUMP 2011 Alamo Group Inc Parts Section 6 54 COMMON LRS ...
Page 224: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 56 COMMON LRS ...
Page 226: ...50IN AND 63IN FLAIL MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 58 COMMON LRS ...
Page 229: ...MANUAL LIFT VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 61 COMMON LRS ...
Page 231: ...ELECTRONIC LIFT VALVE SCHEMATIC REAR STOW 2011 Alamo Group Inc Parts Section 6 63 COMMON LRS ...
Page 232: ...ELECTRONIC LIFT VALVE WIRING DIAGRAM 2011 Alamo Group Inc Parts Section 6 64 COMMON LRS ...
Page 234: ...SELECTOR VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 66 COMMON LRS ...
Page 236: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2011 Alamo Group Inc Parts Section 6 68 COMMON LRS ...
Page 237: ...HYDRAULIC TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 69 COMMON LRS ...
Page 238: ...ELECTRICAL TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 70 COMMON LRS ...
Page 239: ...TROUBLESHOOTING 2011 Alamo Group Inc Parts Section 6 71 COMMON LRS ...
Page 240: ...TROUBLESHOOTING CONTINUED 2011 Alamo Group Inc Parts Section 6 72 COMMON LRS ...
Page 241: ...CLEAN CUTTER HEAD 2011 Alamo Group Inc Parts Section 6 73 COMMON LRS ...
Page 242: ...CLEAN CUTTER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 74 COMMON LRS ...
Page 243: ...CLEAN CUTTER OPERATION 2011 Alamo Group Inc Parts Section 6 75 COMMON LRS ...
Page 244: ...CLEAN CUTTER OPERATION CONTINUED 2011 Alamo Group Inc Parts Section 6 76 COMMON LRS ...
Page 245: ...CLEAN CUTTER MAINTENANCE 2011 Alamo Group Inc Parts Section 6 77 COMMON LRS ...
Page 247: ...CARBIDE TIP REPLACEMENT 2011 Alamo Group Inc Parts Section 6 79 COMMON LRS ...
Page 248: ...NOTES 2 2011 Alamo Group Inc Parts Section 6 80 COMMON LRS ...
Page 249: ...FIRE SUPRESSION SYSTEM 2011 Alamo Group Inc Parts Section 6 81 COMMON LRS ...
Page 250: ...FIRE SUPRESSION SYSTEM PARTS 2011 Alamo Group Inc Parts Section 6 82 COMMON LRS ...
Page 253: ...WETCUT 2011 Alamo Group Inc Parts Section 6 85 COMMON LRS ...
Page 256: ...WETCUT TANK PLUMBING 2011 Alamo Group Inc Parts Section 6 88 COMMON LRS ...
Page 258: ...WETCUT SPRAYER HEAD ASSEMBLY 2011 Alamo Group Inc Parts Section 6 90 COMMON LRS ...
Page 260: ...WETCUT CABLES 2011 Alamo Group Inc Parts Section 6 92 COMMON LRS ...
Page 261: ...WARRANTY SECTION Warranty Section 7 1 ...
Page 262: ... ...
Page 266: ...Printed in USA Tiger Corporation ...