MAINTENANCE
Boom
Maintenance Section 4-27
©2011 Alamo Group Inc.
MAINTENANCE
Boom Cylinder Removal and Replacement Instructions
1.
Clear the area of all personnel before lowering the boom mower head.
2.
From the tractor seat with your seat belt fastened around you, Lower the boom mower head to the
ground. Extend the boom to the furthest reach and lower the mower head flat on the ground. DO NOT
attempt to replace the cylinders with the boom in the raised or transport position.
3.
Shut off the tractor, engage the parking brake, place the tractor transmission in the park position, and
remove the key before dismounting.
4.
Allow the system to cool to room temperature before removing any hydraulic components
5.
Wear Safety glasses and impenetrable gloves when working with hydraulic hoses and fittings.
6.
Release all oil pressure from the hydraulic circuit by manually stroking each valve section with the trac-
tor engine off. Utilize the Manual Override function if the unit is equipped with an electric over hydraulic
valve.
7.
Utilize blocks, jack stands or a suitable over head hoist to support the weight of the boom section and
remove pressure form the cylinder mounting pins.
8.
Check to see that the cylinder to be replaced is not under pressure by moving the cylinder pins by
hand. The pins should be loose and should slide form the pin bore easily. If the pins are tight and can-
not be moved, the cylinder may be under pressure. Make sure the boom components are properly sup-
ported and that the pressure is relived from the circuit.
9.
Cylinder assemblies are heavy and can fall when the pins are removed. Support the hydraulic cylinder
with a suitable hoist or jack.
10.
Slowly loosen the hydraulic connections to the cylinder. Carefully unscrew hose fitting and allow any
remaining pressure to bleed off. Use Extreme Care. Oil must be cool, and the technician should stand
to the side to prevent exposure to any hydraulic oil. Always consult the Material Safety Data Sheet and
wear any required Personal Protective Equipment. A catch pan may be required to retain any spilled
oil.
11.
Cap both ends of the fitting with suitably sized metal caps.
12.
Remove the cylinder pins starting with the ROD end cylinder pin. Make sure the cylinder is properly
supported, and remove the base end cylinder pin. The cylinder may be heavy, use proper lifting tech-
niques to lift and handle the cylinder. If needed, get assistance from another person to safely lift the cyl-
inder from the machine.
13.
Measure the distance between the cylinder pin holes and extend the new cylinder the correct length
prior to attempting an installation.
14.
Install the new cylinder in place and install both cylinder pins and retaining hardware.
15.
Remove the metal caps, and re-install the hydraulic hoses.
16.
Check the hydraulic reservoir of the boom mower to ensure there is sufficient oil. Follow the manufac-
tures recommendations for proper oil type and filtering techniques and requirements to add oil to the
system.
17.
Clear the area of all persons prior to starting the tractor.
18.
Consult the Operator's Manual for instruction in regard to the proper operating procedure.
19.
From the tractor seat, with the seat belt fastened, operate the boom to ensure proper operation of the
boom function.
20.
From the tractor seat, with the seat belt fastened, operate the boom controls to fully extend and retract
the new cylinder several times to purge any trapped air from the system.
21.
From the tractor seat, with the seat belt fastened, look for signs of and oil leak. If an oil leak is
observed, shut the tractor down and follow the steps to remove pressure from the hydraulic circuit.
Identify the source of the leak, and resolve the issue.
22.
Upon completion of the required repairs, return to Step # 16 to recheck the cylinder for proper opera-
tion.
Summary of Contents for BENGAL BRUTE JD 62-6420 CAB
Page 4: ......
Page 6: ......
Page 7: ...SAFETY SECTION Safety Section 1 1 ...
Page 24: ...Safety Section 1 18 SAFETY 33743 INSIDE OF CAB 06550012 INSIDE OF CAB PART NO LOCATION ...
Page 29: ...Safety Section 1 23 SAFETY 34852 HYDRAULIC TANK TB1011 MOWER DECK ...
Page 32: ...Safety Section 1 26 SAFETY ...
Page 33: ...Assembly Section 2 1 ASSEMBLY SECTION JD6X20 BENGAL BRUTE ...
Page 51: ...ASSEMBLY Assembly Section 2 19 ASM C 0094 ...
Page 60: ...ASSEMBLY Assembly Section 2 28 ASM DF CALIBRATION LRS 0001 ...
Page 62: ...ASSEMBLY Assembly Section 2 30 ...
Page 63: ...Operation Section 3 1 2011 Alamo Group Inc OPERATION SECTION ...
Page 108: ...OPERATION Boom Operation Section 3 46 2011 Alamo Group Inc OPERATION ...
Page 109: ...Maintenance Section 4 1 2011 Alamo Group Inc MAINTENANCE SECTION ...
Page 116: ...MAINTENANCE Boom Maintenance Section 4 8 2011 Alamo Group Inc MAINTENANCE ...
Page 137: ...MAINTENANCE Boom Maintenance Section 4 29 2011 Alamo Group Inc MAINTENANCE ...
Page 139: ...PARTS SECTION JD6X20 BENGAL BRUTE BOOM ...
Page 140: ...NOTES ...
Page 142: ...PARTS ORDERING GUIDE 2012 Alamo Group Inc Parts Section 5 4 JD6X20 BENGAL BRUTE ...
Page 143: ...NOTES 2012 Alamo Group Inc Parts Section 5 5 JD6X20 BENGAL BRUTE ...
Page 146: ...TRACTOR MOUNT KIT HYDRAULICS 2012 Alamo Group Inc Parts Section 5 8 JD6X20 BENGAL BRUTE ...
Page 148: ...CABLE CONTROL MOUNTING 2012 Alamo Group Inc Parts Section 5 10 JD6X20 BENGAL BRUTE ...
Page 150: ...CABLE MANUAL LIFT VALVE 4 SPOOL 2012 Alamo Group Inc Parts Section 5 12 JD6X20 BENGAL BRUTE ...
Page 152: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2012 Alamo Group Inc Parts Section 5 14 JD6X20 BENGAL BRUTE ...
Page 154: ...JOYSTICK AND SWITCH BOX MOUNTING 2012 Alamo Group Inc Parts Section 5 16 JD6X20 BENGAL BRUTE ...
Page 162: ...SAFETY LIGHT OPTION 2012 Alamo Group Inc Parts Section 5 24 JD6X20 BENGAL BRUTE ...
Page 164: ...SOLENOID VALVE SWITCH AND WIRING 2012 Alamo Group Inc Parts Section 5 26 JD6X20 BENGAL BRUTE ...
Page 167: ...SWITCH BOX SCHEMATIC 2012 Alamo Group Inc Parts Section 5 29 JD6X20 BENGAL BRUTE ...
Page 168: ...NOTES 1 2012 Alamo Group Inc Parts Section 5 30 JD6X20 BENGAL BRUTE ...
Page 169: ...COMMON LEGAL REAR STOW PARTS SECTION Common Section 6 1 ...
Page 170: ...NOTES ...
Page 173: ...PARTS ORDERING GUIDE 2011 Alamo Group Inc Parts Section 6 5 COMMON LRS ...
Page 174: ...NOTES 2011 Alamo Group Inc Parts Section 6 6 COMMON LRS ...
Page 176: ...LEGAL REAR STOW BOOM ASSY 2011 Alamo Group Inc Parts Section 6 8 COMMON LRS ...
Page 178: ...LEGAL REAR STOW BOOM HYD ASSY 2011 Alamo Group Inc Parts Section 6 10 COMMON LRS ...
Page 180: ...BOOMREST BENGAL BRUTE 2011 Alamo Group Inc Parts Section 6 12 COMMON LRS ...
Page 182: ...BOOMREST PANTHER 2011 Alamo Group Inc Parts Section 6 14 COMMON LRS ...
Page 184: ...LEGAL REAR STOW RTRY PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 16 COMMON LRS ...
Page 186: ...LEGAL REAR STOW FLAIL PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 18 COMMON LRS ...
Page 196: ...50IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 28 COMMON LRS ...
Page 200: ...50IN FLAIL MOWER ASSY PASS THROUGH KNIVES 2011 Alamo Group Inc Parts Section 6 32 COMMON LRS ...
Page 202: ...63IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 34 COMMON LRS ...
Page 204: ...63IN FLAIL MOWER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 36 COMMON LRS ...
Page 211: ...NOTES 1 2011 Alamo Group Inc Parts Section 6 43 COMMON LRS ...
Page 212: ...COOLER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 44 COMMON LRS ...
Page 214: ...ROTARY MOWER SPINDLE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 46 COMMON LRS ...
Page 222: ...FRONT HYDRAULIC PUMP 2011 Alamo Group Inc Parts Section 6 54 COMMON LRS ...
Page 224: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 56 COMMON LRS ...
Page 226: ...50IN AND 63IN FLAIL MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 58 COMMON LRS ...
Page 229: ...MANUAL LIFT VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 61 COMMON LRS ...
Page 231: ...ELECTRONIC LIFT VALVE SCHEMATIC REAR STOW 2011 Alamo Group Inc Parts Section 6 63 COMMON LRS ...
Page 232: ...ELECTRONIC LIFT VALVE WIRING DIAGRAM 2011 Alamo Group Inc Parts Section 6 64 COMMON LRS ...
Page 234: ...SELECTOR VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 66 COMMON LRS ...
Page 236: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2011 Alamo Group Inc Parts Section 6 68 COMMON LRS ...
Page 237: ...HYDRAULIC TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 69 COMMON LRS ...
Page 238: ...ELECTRICAL TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 70 COMMON LRS ...
Page 239: ...TROUBLESHOOTING 2011 Alamo Group Inc Parts Section 6 71 COMMON LRS ...
Page 240: ...TROUBLESHOOTING CONTINUED 2011 Alamo Group Inc Parts Section 6 72 COMMON LRS ...
Page 241: ...CLEAN CUTTER HEAD 2011 Alamo Group Inc Parts Section 6 73 COMMON LRS ...
Page 242: ...CLEAN CUTTER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 74 COMMON LRS ...
Page 243: ...CLEAN CUTTER OPERATION 2011 Alamo Group Inc Parts Section 6 75 COMMON LRS ...
Page 244: ...CLEAN CUTTER OPERATION CONTINUED 2011 Alamo Group Inc Parts Section 6 76 COMMON LRS ...
Page 245: ...CLEAN CUTTER MAINTENANCE 2011 Alamo Group Inc Parts Section 6 77 COMMON LRS ...
Page 247: ...CARBIDE TIP REPLACEMENT 2011 Alamo Group Inc Parts Section 6 79 COMMON LRS ...
Page 248: ...NOTES 2 2011 Alamo Group Inc Parts Section 6 80 COMMON LRS ...
Page 249: ...FIRE SUPRESSION SYSTEM 2011 Alamo Group Inc Parts Section 6 81 COMMON LRS ...
Page 250: ...FIRE SUPRESSION SYSTEM PARTS 2011 Alamo Group Inc Parts Section 6 82 COMMON LRS ...
Page 253: ...WETCUT 2011 Alamo Group Inc Parts Section 6 85 COMMON LRS ...
Page 256: ...WETCUT TANK PLUMBING 2011 Alamo Group Inc Parts Section 6 88 COMMON LRS ...
Page 258: ...WETCUT SPRAYER HEAD ASSEMBLY 2011 Alamo Group Inc Parts Section 6 90 COMMON LRS ...
Page 260: ...WETCUT CABLES 2011 Alamo Group Inc Parts Section 6 92 COMMON LRS ...
Page 261: ...WARRANTY SECTION Warranty Section 7 1 ...
Page 262: ... ...
Page 266: ...Printed in USA Tiger Corporation ...