OPERATING YOUR BOAT
5-17
53 FLYBRIDGE
Any person who violates waste disposal requirements is liable for a
FLYLOSHQDOW\RIXSWRD¿QHRIXSWRDQGLPSULVRQ
-
PHQWIRUXSWR¿YH\HDUVIRUHDFKYLRODWLRQ5HJLRQDOVWDWHDQGORFDO
restrictions on garbage discharges also may apply.
NOTICE
5.3.2 Anchoring
se the anchor and anchor rode
provided to anchor your boat
while away rom the doc . he
anchor loc er
Figure 5-10
is
accessed via a hatch located in
the oredec . his loc er is large
enough to store all o the anchor
rope chain rode. he anchor,
when stowed, is integrated into
the bow stem.
pecifics regarding the proper
techniques, equipment and con
-
ditions for safe anchoring can
be found in
Chapman Piloting &
Seamanship
, or through a boat
-
ing safety course.
The safety cable must be re-
moved before anchoring.
o operate the anchor windlass, switch
the
brea er
on the star-
board side o the aster
istribution anel
.
Remove the safety cable (Figure
5-10).
se the
helm switch or the windlass remote located in the
anchor loc er to activate the windlass to either lower or raise the anchor. lease
re er to the windlass manu acturer s user manual or operating instructions.
Figure 5-10: Anchor locker with
windlass, mooring cleat and safety cable
Summary of Contents for FLYBRIDGE 53 2019
Page 4: ...This page intentionally left blank ...
Page 6: ...This page intentionally left blank ...
Page 12: ...SAFETY LABEL LOCATIONS iv 53 FLYBRIDGE 1 FLYBRIDGE 16 16 4 5 6 10 11 12 13 16 3 ...
Page 18: ...SAFETY LABEL LOCATIONS x 53 FLYBRIDGE This page intentionally left blank ...
Page 56: ...EQUIPMENT AND FEATURES 1 28 53 FLYBRIDGE This page intentionally left blank ...
Page 65: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 FLYBRIDGE Figure 2 8 VIP head Figure 2 9 Utility room ...
Page 102: ...OPERATING YOUR BOAT 5 20 53 FLYBRIDGE This page intentionally left blank ...
Page 114: ...COMMISSIONING YOUR BOAT 6 12 53 FLYBRIDGE 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Page 136: ...ROUTINE MAINTENANCE 7 22 53 FLYBRIDGE 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Page 159: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 3 53 FLYBRIDGE ...
Page 160: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 4 53 FLYBRIDGE ...
Page 161: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 5 53 FLYBRIDGE ...
Page 162: ...DATE MAINTENANCE REPAIR LOG OPERATING HOURS APPENDIX C MAINTENANCE SCHEDULES C 6 53 FLYBRIDGE ...
Page 163: ...Appendix D BOATING ACCIDENT REPORT D 1 53 FLYBRIDGE ...
Page 164: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 FLYBRIDGE ...
Page 165: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 FLYBRIDGE ...
Page 166: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 FLYBRIDGE ...
Page 167: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 FLYBRIDGE ...
Page 168: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 FLYBRIDGE ...
Page 169: ...Appendix E FLOAT PLAN E 1 53 FLYBRIDGE ...
Page 170: ...APPENDIX E FLOAT PLAN E 2 53 FLYBRIDGE ...
Page 172: ...Operator Notes APPENDIX E FLOAT PLAN E 4 53 FLYBRIDGE ...