background image

TCSG5270 Sounder Strobe User Manual

Ver 1.0 2022.03

Liaoning

·

Yingkou Tiancheng Fire Protection Equipment Co., Ltd

4

Fig.2 Pre-embeded Diagram of Incoming Wire Duct

5.1.4 Wiring. Take out the "upper cover" and correctly connect the wires to the corresponding terminals. The
contact should be reliable and firm, and there should be no burrs.
5.1.5 Insert the upper cover. After the system wiring is verified, insert the upper cover into the base in the
correct direction, and press to fasten the two parts.
5.2 The diagram of the wiring terminal is shown in Fig. 3.

Fig.3 Diagram of Wiring Terminals of Sounder Strobe TCSG5270

Terminal description:

L1, L2: Two bus input terminals without polarity loop

5.3 Wiring requirements
L1, L2 non-polar loop two-bus lines use BV twisted pair with cross-sectional area ≥ 1.0mm2.
Please refer to local regulations.

6. Test

Warning: Turn on the system power after all equipment has been installed correctly.
6.1 The sounder strobe must be tested at least annually after installation or during use.
6.2 Before the sounder strobe is tested, the relevant management department should be notified that the
system will be maintained and will temporarily stop working due to this. At the same time, the logic control
function of the area or system to be maintained should be cut off to avoid unnecessary alarm linkage.
6.3 Test content: A start command is issued from the control panel to the sounder strobe, the sounder strobe will
act, and emit sound and light signals, which indicates that the sounder strobe is normal.
6.4 After test, disconnect the power to reset the sounder strobe, and notify the relevant management
department that the system is back to normal.
6.5 During the test, the unqualified audible and visual alarms shall check whether their connecting wires are
normal, and then perform the test. If they still fail to pass the test, they shall be returned for repair.

7. Use and Operation

The coding method of this sounder strobe is electronic coding that is simple and fast. The TCBM5023 electronic
encoder produced by our company can be used for coding on site. When coding, the electronic encoder is
connected to the bus terminal of sounder strobe (regardless of polarity). Then the address code can be written

Summary of Contents for TCSG5270

Page 1: ...Manual Ver 1 0 2022 03 Liaoning Yingkou Tiancheng Fire Protection Equipment Co Ltd 1 Please read this user manual carefully before installation TCSG5270 Sounder Strobe User Manual Liaoning Tiancheng Fire Protection Equipment Co Ltd ...

Page 2: ...With self diagnosis function to ensure its reliable operation 2 5 The status signal value can be provided which intuitively reflects the current working status of the sounder strobe 2 6 Multi level filtering with software and hardware can effectively suppress interference signals 2 7 When the sounder strobe is activated it can emit strong light and produce a harsh alarm sound 2 8 The appearance de...

Page 3: ...rol panel it starts light and sound signals The sound chip is amplified by the transistor and inductor to drive the speaker to make a sound the timing circuit is used to control the ultra high light emitting diode to emit a shining light signal 5 Installation and Wiring 5 1 1 Take the base The TCSG5270 sounder strobe is composed of two parts base and top cover including circuit board Remove the ba...

Page 4: ...se 6 2 Before the sounder strobe is tested the relevant management department should be notified that the system will be maintained and will temporarily stop working due to this At the same time the logic control function of the area or system to be maintained should be cut off to avoid unnecessary alarm linkage 6 3 Test content A start command is issued from the control panel to the sounder strob...

Page 5: ...coding succeeds it displays successful otherwise displays failed 8 Application The signal bus of the sounder strobe is connected to the loop bus of the control panel If it is necessary to start the sounder strobe the fire alarm controller can directly start it or start through a linkage programming 9 Documents and Maintenance Manual 9 1 Packing documents 1 Packing list 1 2 User manual 1 9 2 Warran...

Reviews: