84
NV021 - Manual - 08 - 2012
INSTALLATION
Rimuovere il tegolino superiore ed aprire lo sportellino per accede alla sede delle viti di fi ssaggio.
Fissare la protezione al pannello mediante quattro viti.
Projecting mounting
Remove the ground screw and open the little door to access the fastening screws.
In case of side-by-side mounting of several relays, the minimum fi xing distance is determined by the
dimensions of the mounting plate indicated in the overall dimensions drawing, increased horizontally
and vertically by as much as needed to allow room for the wiring and to ensure an adequate toler-
ance between the apparatus.
•
•
•
Remove-tile.ai
Removing tie to access the fastening screws
Remove-tile.ai
Removing tie to access the fastening screws
Flush-mount1.ai
Four screws
Flush-mount1.ai
Four screws
Project mounting
Projecting.ai
ON
3
1
5
4
TRIP
START
120
80
31
275
Project mounting
Projecting.ai
ON
3
1
5
4
TRIP
START
120
80
31
275