Gas Connection 

 

NOTE:  ALL GAS FITTING MUST ONLY BE CARRIED OUT BY A QUALIFIED PERSON. 

 

A 3/4" male BSP line for the gas connection is located near the lower right rear corner of the fryer. 

The  serial plate  (located  inside  the  front  door  of  the  fryer)  indicates  the  type  of  gas  the  unit  is 

equipped to burn (natural gas or propane). The fryer should be connected ONLY to the type of gas 

for which it is equipped. 

 

If applicable, the vent line from the gas appliance pressure regulator shall be installed to the  

outdoors  in accordance  with  local  codes  or,  in  the  absence  of  local  codes,  with  the 

Australia:  AS 

5601/AG 601 (to be AS 5601) - Gas Installations or New Zealand: NZS 5261 - Gas Installation. 

 

An adequate gas supply is imperative. Undersized or low pressure lines will restrict the volume of 

gas necessary for satisfactory performance. A combination gas valve and pressure regulator, which 

is provided with each unit, is set to maintain a 1.0kPa manifold pressure for natural gas or 2.75kPa 

manifold pressure for propane gas. Fluctuations of more than 25% on natural gas or10% on  

propane gas will create problems and affect burner operating characteristics. 

 

Purge the supply line to clean out dust, dirt, or other foreign matter before connecting the line to 

the unit.   It is recommended that an individual manual shutoff valve be installed in the gas  

Supply line to the unit. Use pipe joint compound that is suitable for use with both natural and LP 

gas on all threaded connections. 

 

 

 

 

 

 

ALL PIPE JOINTS AND CONNECTIONS MUST BE TESTED THOROUGHLY FOR GAS LEAKS. USE 

GAS LEAK DETECTION FLUID FOR TESTING ON ALL GASES.NEVER USE AN OPEN FLAME TO 

CHECK FOR GAS LEAKS.ALL CONNECTIONS MUST BE CHECKED FOR LEAKS AFTER THE UNIT 

HAS BEEN PUT INTO OPERATION.TEST PRESSURE SHOULD NOT EXCEED 3.45kPa 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for GL165-N

Page 1: ...vapors or liquids in the vicinity of this or any other appliances Keep the area free and clear of combustible materials WARNING Improper installation adjustment alteration service or maintenance can c...

Page 2: ...s Unpacking Location Clearances Assembly Gas Connection Commissioning Operation 10 Operation Guide Filling the Fryer Pot Shutdown Procedure Relighting Automatic Pilot Valve High Limit Control Cleaning...

Page 3: ...READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS APPLIANCE WARNING INSTRUCTIONS TO BE FOLLOWED INTHE EVENT THE USER SMELLS GAS ARE TO BE POST...

Page 4: ...t Chain Gas Supply Requirements Natural Gas G20 Propane G31 Butane G30 GL165 N GL166 N GL165 P GL166 P GL165 P GL166 P Single burner Heat Input 8 8 KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW Heat Total 26...

Page 5: ...Thor Fryer Manual 12082014 Page 5 Dimensions GL165 P GL165 N GL166 P GL166 N...

Page 6: ...e only to be adjusted by an authorized service agent They are not to be adjusted by the installation person Unpacking Remove all packaging and transit protection from the appliance including all prote...

Page 7: ...250mm 0mm 0mm Assembly NOTE This appliance is assembled before delivery except castors This appliance is fitted with adjustable castors to enable the appliance to be positioned securely and level Thi...

Page 8: ...t the volume of gas necessary for satisfactory performance A combination gas valve and pressure regulator which is provided with each unit is set to maintain a 1 0kPa manifold pressure for natural gas...

Page 9: ...er is level Use along spirit level four ways across the front and rear of the fryer pot and along each edge Commissioning 1 Before leaving the new installation a Check the following functions in accor...

Page 10: ...g procedure and keep the ignition button down longer Adjustment of pilot flame may be necessary 4 When the pilot stays lit turn the knob counter clockwise to the temperature required Do not press down...

Page 11: ...elted Additional solid shortening can then be added until the desired frying depth has been reached 8 Replace the basket support frame over the fryer pot heat tubes Shutdown Procedure Standby Turn the...

Page 12: ...THIS SPACE All burners are lit from constantly burning pilots Turning the valve to the desired flame height is all that is required to put the unit in service Do not permit fans to blow directly at t...

Page 13: ...support frame if applicable and flush out any sediment remaining in the fryer pot with a little hot oil 4 Wipe off the basket support frame and the inside of the fryer pot with a clean cloth CAUTION...

Page 14: ...bove procedure can usually be removed by rubbing the surface with SCOTCH BRITE scouring pads or STAINLESS scouring pads DO NOT USE ORDINARY STEEL WOOL as any particles left on the surface will rust an...

Page 15: ...ce dependable advice or other assistance and for genuine factory parts All units are adjusted at the factory In case of problems in operation at initial installation check type of gas and manifold pre...

Page 16: ...ontrol unit is faulty Hold knob in for at least 20 seconds following ignition of the pilot Clean or replace the pilot injector Tighten the thermocouple connection Check that the thermocouple is produc...

Page 17: ...Explosion drawing GL165 P GL165 N GL166 P GL166 N Thor Fryer Manual 01112013 Page 17...

Page 18: ...1068571 1 7 Basket GL165 P GL165 N GL166 P GL166 N 01 10 1061027 2 8 Flue Rear GL165 P GL165 N GL166 P GL166 N 01 15 1066336 01 15 1066411 1 9 Fryer Restraint Chain GL165 P GL166 P GL165 N GL166 N 06...

Page 19: ......

Page 20: ...V1 Rev2 12 14...

Reviews: