THOR GL165-N Installation And Operation Instruction Manual Download Page 10

Thor Fryer Manual 12082014 

Page 10 

 

Operation 

 

Operation Guide 

 

C A U T I O N :

 

 

• 

THIS APPLIANCE IS FOR PROFESSIONAL USE AND IS ONLY TO BE USED BY QUALIFIED PEOPLE.

 

 

• 

ONLY QUALIFIED SERVICE PERSONS ARE TO CARRY OUT INSTALLATION, SERVICING OR GAS CONVERSION 

OPERATIONS.

 

 

• 

COMPONENTS HAVING ADJUSTMENTS PROTECTED (E.G. PAINT SEALED) BY THE MANUFACTURER SHOULD NOT 

BE ADJUSTED BY THE USER/OPERATOR.

 

 

 

Open the burner compartment door and do the following: 

1

 

Turn thermostat to “0” before lighting the pilot. 

2

 

Press down the 

 ignition button and hold down. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 

 
 

3

 

While pressing the ignition button down, use a lit match or piezo ignitor to ignite the pilot. Continue to 

press the knob down for about 30 seconds. If the pilot does not stay lit when the ignition button is 

released, repeat the lighting procedure and keep the ignition button down longer. Adjustment of pilot 

flame may be necessary. 

4

 

When  the  pilot  stays  lit,  turn  the  knob  counter  clockwise  to  the temperature required.  Do  not  press 

down on the knob in this step. 

5

 

Do NOT turn the thermostat on until the fryer pot is filled with oil or solid shortening. 

6

 

Once the fryer pot is filled with oil, set the thermostat to the desired temperature 

 

Filling the fryer pot 
1.

 

Close drain valve completely before filling the fryer pot. 

2.

 

When the fryer is new, fill the fryer pot with water and clean thoroughly (see “Weekly Cleaning” on 

page 14) in order to remove protective coatings and any foreign matter. 

3.

 

The recommended solid shortening capacity for the fryer pot(35lbs/16kgs,45lbs/20kgs,55lbs/25kgs)is 

described on the  serial plate (which is located inside the front door). 

4.

 

Remove the basket support frame when filling the fryer pot with solid shortening. 
 

Shut-down Button 

Thermostat 

Pilot Position 

Piezo Ignitor 

Summary of Contents for GL165-N

Page 1: ...vapors or liquids in the vicinity of this or any other appliances Keep the area free and clear of combustible materials WARNING Improper installation adjustment alteration service or maintenance can c...

Page 2: ...s Unpacking Location Clearances Assembly Gas Connection Commissioning Operation 10 Operation Guide Filling the Fryer Pot Shutdown Procedure Relighting Automatic Pilot Valve High Limit Control Cleaning...

Page 3: ...READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS APPLIANCE WARNING INSTRUCTIONS TO BE FOLLOWED INTHE EVENT THE USER SMELLS GAS ARE TO BE POST...

Page 4: ...t Chain Gas Supply Requirements Natural Gas G20 Propane G31 Butane G30 GL165 N GL166 N GL165 P GL166 P GL165 P GL166 P Single burner Heat Input 8 8 KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW Heat Total 26...

Page 5: ...Thor Fryer Manual 12082014 Page 5 Dimensions GL165 P GL165 N GL166 P GL166 N...

Page 6: ...e only to be adjusted by an authorized service agent They are not to be adjusted by the installation person Unpacking Remove all packaging and transit protection from the appliance including all prote...

Page 7: ...250mm 0mm 0mm Assembly NOTE This appliance is assembled before delivery except castors This appliance is fitted with adjustable castors to enable the appliance to be positioned securely and level Thi...

Page 8: ...t the volume of gas necessary for satisfactory performance A combination gas valve and pressure regulator which is provided with each unit is set to maintain a 1 0kPa manifold pressure for natural gas...

Page 9: ...er is level Use along spirit level four ways across the front and rear of the fryer pot and along each edge Commissioning 1 Before leaving the new installation a Check the following functions in accor...

Page 10: ...g procedure and keep the ignition button down longer Adjustment of pilot flame may be necessary 4 When the pilot stays lit turn the knob counter clockwise to the temperature required Do not press down...

Page 11: ...elted Additional solid shortening can then be added until the desired frying depth has been reached 8 Replace the basket support frame over the fryer pot heat tubes Shutdown Procedure Standby Turn the...

Page 12: ...THIS SPACE All burners are lit from constantly burning pilots Turning the valve to the desired flame height is all that is required to put the unit in service Do not permit fans to blow directly at t...

Page 13: ...support frame if applicable and flush out any sediment remaining in the fryer pot with a little hot oil 4 Wipe off the basket support frame and the inside of the fryer pot with a clean cloth CAUTION...

Page 14: ...bove procedure can usually be removed by rubbing the surface with SCOTCH BRITE scouring pads or STAINLESS scouring pads DO NOT USE ORDINARY STEEL WOOL as any particles left on the surface will rust an...

Page 15: ...ce dependable advice or other assistance and for genuine factory parts All units are adjusted at the factory In case of problems in operation at initial installation check type of gas and manifold pre...

Page 16: ...ontrol unit is faulty Hold knob in for at least 20 seconds following ignition of the pilot Clean or replace the pilot injector Tighten the thermocouple connection Check that the thermocouple is produc...

Page 17: ...Explosion drawing GL165 P GL165 N GL166 P GL166 N Thor Fryer Manual 01112013 Page 17...

Page 18: ...1068571 1 7 Basket GL165 P GL165 N GL166 P GL166 N 01 10 1061027 2 8 Flue Rear GL165 P GL165 N GL166 P GL166 N 01 15 1066336 01 15 1066411 1 9 Fryer Restraint Chain GL165 P GL166 P GL165 N GL166 N 06...

Page 19: ......

Page 20: ...V1 Rev2 12 14...

Reviews: