4. Handling  

 

4.1 Before initial operation 

 
Initial operation is only allowed when 
 
► the machine has been checked for complete sufficiency 
► the set up conditions have been followed 
► the transportation safety device has been removed 
► the instruction manual has been read completely 
► all safety regulations have been adhered to 

4.2 Explanation to machine operation 

 

 

 

 
 

 

feed chute 

top  cover 

rockerswitch   
On/Off 

ejection opening 

frame 

cover sheet 

name plate 

transportation 
safety device 

front cover 

LED indicating 
the readiness 
for operation 

polishing bin 

Summary of Contents for TD 3000L M14

Page 1: ...s Cutlery polishing machine TD 3000L M14 Kitchen and Cutlery Systems Hettenbergring 47 D 74889 Sinsheim Tel 49 0 7261 9754 93 Fax 49 0 7261 9754 94 08 2017 English translation of the original operatin...

Page 2: ...SAFETY DEVICE 6 4 HANDLING 7 4 1 BEFORE INITIAL OPERATION 7 4 2 EXPLANATION TO MACHINE OPERATION 7 4 3 START UP AND OPERATION OF THE CUTLERY POLISHING MACHINE 8 4 4 FURTHER SAFETY REFERANCES 8 5 CLEA...

Page 3: ...ed personnel are elligeable to operate the machine Always keep this manual within reach Observe all safety precautions and indications When passing on the machine to any other persons be sure to hand...

Page 4: ...ns electrical current carrying parts After opening the risk of death or serious injury could occur Repairs can only be made by D rr authorised service technicians with original D rr spare parts and ac...

Page 5: ...to the following information when storing the machine Do not store the machine in a moist area Cover up wrap up or keep the machine in its original packaging Assure a stable storing method Always kee...

Page 6: ...the transportation safety device It could result in damaging the machine The transportation safety device must be removed before the first initial operation 1 Open the top cover and remove the Star gr...

Page 7: ...en followed the transportation safety device has been removed the instruction manual has been read completely all safety regulations have been adhered to 4 2 Explanation to machine operation feed chut...

Page 8: ...e readiness for operation is indicated after 30 min by the green LED The wet cutlery can now be inserted into the feed chute 7 After use let the machine run for about 20 minutes so the wet granulate c...

Page 9: ...owder acid leaching steel wool or wire brushes to clean the machine 5 2 Replacing the granulate and cleaning the machine The granulate must be replaced after approx 200 operating hours or 8 weeks for...

Page 10: ...and disconnect the power plug from the electrical socket 1 Open the top lid and remove the upper screws from the front cover using a 4mm allen wrench Loosen the bottom 2 screws by turning them counte...

Page 11: ...ranulate grain increases it comes out through the holes in the screen and falls out of the machine The granulate can become too wet when it is not hot enough and the water therefore does not evaporate...

Page 12: ...D rr polishing granulate The amount needed is exactly one filling Switch off the machine open the top cover and if necessary also the cover sheet and remove the cutlery If this happens often the gran...

Page 13: ...chine with 30 40 cutlery pieces Afterwards only place a hand full of cutlery inside the machine after the previous fed cutlery has vanished underneath the granules In case the granules have absorbed t...

Page 14: ...djustable wheels We recommend in addition the basket holder or the sound absorbing cutlery catcher Art No 0017212 Basket holder TD 3000L It s installed over the ejection opening The cutlery basket can...

Page 15: ...3000 cutlery pieces per hour Consumption 550 W Weight 50 kg Dimensions L x W x H 60 x 54 x 40 5 cm Noise level not in operation 64 dB A 67 dB A Noise level in operation 67 dB A 72 dB A Noise level di...

Page 16: ...reby certify that the machine described below fulfills the applicable basic safety and health requirements of the associated EU Guidelines in terms of its design and construction as well as the versio...

Page 17: ...Page 17 of 18 MAX D RR GmbH F rderanlagen Gemmingen 13 04 2016 ___________________________________ Thomas D rr CEO 12 Notes...

Page 18: ...Page 18 of 18...

Reviews: