Installation instructions for mains wire-in protectors
Page
|
8
DIN Installation
ESP D1 Series protectors have been designed with an
innovative DIN foot for connection to standard 35mm DIN rails.
This DIN foot, comprising spring loaded steel DIN mounts,
enables rapid positioning of D1 protectors onto the rail.
The spring loaded steel DIN mounts pull down and out
to lock into place ready for siting the protector.
Position the D1 protector at the preferred location on the
DIN rail and press the protector back to release the springs.
The protector locks into place.
3
Figure 3 - Reverse of
3 phase protector
showing innovative
spring loaded
DIN foot.
Figure 4 - Reverse
of 3 phase protector
showing spring
loaded DIN foot
locked onto DIN rail.
Remote display
Three phase ESP D1R and D1R/LCD units include a remote
mounting display to ensure optimum positioning of the
unit along with quick and easy status checking.
The remote display should be mounted in a clearly visible
position, typically on the front of the distribution panel
(see Figure 5)
.
For remote display connection, ensure the cable is of
sufficient length, and is unimpeded within the cabinet.
Allow a minimum of 60 mm behind the front panel for the
interconnection cable.
ESP D1R and D1R/LCD units are supplied with 1 m
interconnection cable as standard, with a 4 m cable
available as an option (contact Furse).
4
Figure 5 -
ESP 415 D1R/LCD
remote display
installed on the
front of a power
distribution panel.
TNB 1639 ESP D1 Instructions (Final Art) new size 1/4/10 09:51 Page 8