background image

T9901090-5-1 UK (v9) 

 

Page | 15  

 

 

 

13.1 Optional features 

 
 
 
DIP switches on the air curtain Ecopower PCB (see Fig 18) provide 
the following optional features, as explained below: 
 

 

Fan heat interlock 

 

Disable fan run-on 

 

Thermostat master (for master/slave installations) 

 

Weather compensation heat control (Summer/Winter) 

 Door 

switch 

control 

 
 

Feature 

 

DIP setting 

Default 

Notes 

Fan heat interlock 

Allows fan speed to govern heat 
output on electric heated units.  
 
If low or medium fan speed is 
selected, a lower heat output 
results. High heat operates only 
on high fan speed. 

DIP 1 
 

ON 

 
Heat output is 
governed by fan 
speed. 

This feature is only used with 
electric heated air curtains to 
limit very high air 
temperatures. 
 
Set DIP1 to OFF if unit is 
water heated or ambient. 

Disable fan run-on  

The 2 minute fan run-on after 
switch off is enabled or disabled 
on electric heated air curtains.

 

DIP 2 
 

OFF 

 
Fan run-on at 
medium speed 
enabled. 

Must only be used for water 
heated or ambient air 
curtains. Each air curtain 
must have DIP2 set to ON for 
no fan run-on. 

Thermostat master

 

For master/slave installations. 
Only the air sensor in the 
thermostat master air curtain is 
used to measure air temperature. 
 
Set DIP 3 to ON in the air curtain 
that will be the master unit.

 

DIP 3 
 

OFF 

 
Air curtains in 
master/slave 
systems all act 
independently. 

Air sensor thermistors in all 
slave air curtains will be 
ignored. 
 
Stops some units blowing 
cold air and others blowing 
warm air in master/slave 
systems on larger doorways. 

Weather compensation control 
or  Door switch control

 

 
Simple weather compensation 
control to save heating energy. 
             

or 

Door switch control. 

DIP 4 
 

OFF 

IN1 Weather 
compensation 
 
 

ON 

IN1 Door switch 

See section 11.1 Remote 
Switch Contacts IN0 and IN1 
for details 
 
Weather compensation 
control is the same as 
Summer/Winter control 

 
 
 
 
 
 
 
 

 

13. SYSTEM 

CONFIGURATION 

Fig 18 

WARNING:

  Isolate and disconnect air curtain from the power source before making any changes. 

ON

1

2

3

4

ON

1

2

3

4

ON

1

2

3

4

NOTE: 

A range of

 

advanced factory fitted and plug-in control options are available from Thermoscreens to 

enhance the performance of the Ecopower PCB controller inside the air curtain. These include 
advanced weather compensation control using a heating curve, outlet air temperature control, 
ECObus

®

 Modbus BMS control, modulating heater outputs and EEPROMs for non-standard control 

strategies. Visit the Thermoscreens website for details. 

NOTE:            

Black rectangle is moveable head of DIP switch. 

ON

1

2

3

4

Summary of Contents for Designer PHV Series

Page 1: ...T9901090 5 1 UK v9 Page 1 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS English PHV Series Designer Horizontal and Vertical...

Page 2: ...19 19 SERVICE MAINTENANCE 20 20 WARRANTY 21 APPENDIX 1A DIMENSIONS OF HORIZONTAL AIR CURTAIN WALL MOUNTED 22 APPENDIX 1B DIMENSIONS OF HORIZONTAL AIR CURTAIN CEILING MOUNTED 23 APPENDIX 2 DIMENSIONS...

Page 3: ...ft hand side of the air curtain refer Appendix 1 The adjacent picture details optional electrical connection entry points for vertical Designer PHV models Power and control cables for vertical units s...

Page 4: ...PHVD1500W V 230 1 50 0 40 1 8 9 0 18 0 82 PHVD2000W PHVD2000W V 230 1 50 0 60 2 7 12 0 24 0 107 PHVD2500W V Stacked Unit Top air curtain 230 1 50 0 30 1 3 15 30 143 Bottom air curtain 230 1 50 0 40 1...

Page 5: ...building located horizontally over a doorway or vertical close to door opening They must not be installed on the outside of a building or built into a cabinet or recessed in any way Please complete th...

Page 6: ...ittings Supplied with 6m RJ Control Cable Outdoor Air Thermostat Optional supplied by Installer Accessories Spare M4 socket button screws 2 5mm hexagon key wrench M10 stainless steel dome nuts vertica...

Page 7: ...ner PHV unit and carefully detach the back and inlet grille panels All screws should be kept safe as they will be required later in the installation Designer PHV horizontal air curtains are supplied w...

Page 8: ...fully detach the back and inlet grille panels All screws should be kept safe as they will be required later in the installation Before installing the Designer PHV unit obtain four suitable fixing bolt...

Page 9: ...bolts Tighten each M10 nut as indicated in the adjacent picture Ensure the vertical unit is secure level and square Using a hacksaw carefully cut the projecting bolt flush with the nut ensuring the b...

Page 10: ...g 9 are fitted to both the flow and return pipework Flow and return pipework Flow and return pipework Air Curtain 2 row coil based on 82 71 C 3 row coil based on 60 40 C Water Flow Rate l min Water Pr...

Page 11: ...e and secure back case to switch box using 2 mounting screws not supplied see Fig 12 Step 3 Connect the RJ plug to the RJ socket on the PCB in the remote control Step 4 Refit the front case On the bac...

Page 12: ...itch Control After 30s the heating is disabled and the fan goes to low speed Unit operates normally in MANUAL Mode or AUTO Mode from the Remote Control ON Door Open Normal Control Door Closed Heating...

Page 13: ...free contacts supplied by the installer to a north facing wall Use a 2 core cable to connect the outdoor air thermostat to 2 way terminal IN1 on the Ecopower PCB see Fig 15 On the Ecopower PCB set DI...

Page 14: ...ed separately For horizontal Master Slave configuration an independent mains supply as per Table 1 must be supplied to each air curtain Electrical Mains Supply RJ Cable Electrical Mains Supply Electri...

Page 15: ...r curtain is used to measure air temperature Set DIP 3 to ON in the air curtain that will be the master unit DIP 3 OFF Air curtains in master slave systems all act independently Air sensor thermistors...

Page 16: ...at 3m distance are for a single air curtain mounted at its maximum mounting height operating in a room with average acoustic characteristics as defined in CIBSE Guide B5 reverberation time 0 7s at 1kH...

Page 17: ...lf heat to full heat by stepping up or down with the heating level controls The heating level scale shows the level selected Automatic mode Heat output is controlled automatically according to Inlet a...

Page 18: ...curtain must be given supervision and instruction by the person responsible for their safety concerning the safe use of the unit and to understand any hazards involved Children and those with reduced...

Page 19: ...and after 30 seconds the LEDs on the remote control will stop flashing and the status LED on the Ecopower PCB in the air curtain will flash green 18 2 Fuses In the event of an electrical fault intern...

Page 20: ...s are in good condition Refit air inlet grilles after servicing Reconnect electrical supply and test to ensure correct operation see Section 16 Commissioning 19 SERVICE MAINTENANCE NOTE Weekly mainten...

Page 21: ...has been taken in compiling these instructions to ensure they are correct Thermoscreens Ltd disclaims all liability for damage resulting from any inaccuracies and or deficiencies in this documentatio...

Page 22: ...tions Wall Bracket with 3 off Holes 75mm apart for M10 Rawl Bolts ENTERING AIR DISCHARGE AIR 350 550 250 200mm minimum clearance for air intake 500 PHV D1000 2345 1712 1250 A mm PHV D1500 PHV D2000 A...

Page 23: ...nections Ceiling Bracket with 2 off 12mm dia holes 150mm apart PHV D1000 2345 1712 1250 A mm PHV D1500 PHV D2000 A 10mm A ENTERING AIR DISCHARGE AIR 350 200mm minimum clearance for air intake 200 500...

Page 24: ...ectrical Connections if entry via floor void Alternative Entry Point for Water and Electrical Connections DOORWAY RH LH OUTSIDE INSIDE Handing Guide 2 0m max Air inlet Air inlet 3 Holes for M10 Distan...

Page 25: ...an 1 J17 ECO Power CVR1008 9 10 9 8 7 6 5 4 3 2 1 L3 N L2 L1 J10 J16 J12 J5 J6 J11 R 0 10V J14 Th EEPROM F2 F1 J9 Alarm Healthy Black rectangle is moveable head of DIP switch Brown Blue Brown Blue Bro...

Page 26: ...tangle is moveable head of DIP switch A1 A2 13NO 14NO 1 2 3 4 5 6 CONTACTOR 230V AC Coil Brown Black Grey TERMINAL BLOCK L1 L2 L3 N E L1 L2 L3 N E 400V 3ph 50Hz Brown Brown Blue Blue Summer Winter or...

Page 27: ...L2 L3 N E L1 L2 L3 N E 400V 3ph 50Hz Brown Brown Blue Blue 85 C Auto Thermal Trip x2 Summer Winter or Door Contact First Stage Heating bottom elements Second Stage Heating top elements Black Black Br...

Page 28: ...J9 Black rectangle is moveable head of DIP switch Grey Orange White Blue Green Yellow Brown 3 PORT VALVE 1 2 3 4 E Black White Summer Winter or Door Contact Brown Blue Black Blue Red White 0 1 2 3 4...

Page 29: ...5 J6 J11 R 0 10V J14 Th EEPROM F2 F1 J9 Black rectangle is moveable head of DIP switch Brown Summer Winter or Door Contact Brown Blue Black Blue Red White 0 1 2 3 4 1 White COMMON Black High Blue Red...

Page 30: ...VD2000E V PHVD2000W V Relevant EC Council the Machinery Directive 2006 42 EC Directives the Low Voltage Directive 2006 95 EC the Electromagnetic Compatibility Directive 2004 108 EC the Energy related...

Reviews: