Using the base plate as a template, mark the location of the
four holes, as indicated in the adjacent picture.
Using a suitable masonry drill bit correctly drill the four
marked out holes. Place M10 fixing bolts into each hole,
ensuring all bolts are upright.
Reposition the air curtain base plate over the projecting
bolts. Tighten each M10 nut as indicated in the adjacent
picture. Ensure the vertical unit is secure, level and square.
Using a hacksaw carefully cut the projecting bolt flush with
the nut, ensuring the base plate is not damaged or marked
in any way.
Remove only one M10 nut and refit and secure bolt with a
stainless steel M10 dome nut supplied. Repeat for each of
the other three projecting bolts one at a time.
Back and inlet grille panels should only be fitted after all
functional tests have been completed and verified (See
Commissioning).