background image

Owner’s Manual                   KAC/KHP/KAC-M/KHP-M Series

ThermoPlus Air, Inc.     February  2007                                                                                                                                                                           5

Data subject to change without notice.

Startup  

Pre-Startup Adjustments              Adjust Airflow

Before the unit is operated, the supply duct air flow must be measured and set
by a qualified air-balancing technician.  Air flow must be measured with all air
side access doors closed. 

Air flow is adjusted by changing the variable sheave on the blower motor shaft.  Do not

use other sheaves or change the airflow outside the range given on the unit nameplate,
without the express approval of ThermoPlus.

To run the blower only:

1. Turn on the branch-circuit disconnect switch.  Some  units may have voltage monitors
that prevent operation in the event the branch circuit has voltage that is too high, too low,
has lost a phase, or has reversed phase rotation.  If the green LED 
is not lit, confirm that the applied voltage is within ±10% of the nameplate voltage 
(NEMA MG-1), that all three phases are present, and that the phase rotation is correct.

2. In the unit electrical enclosure, press START on the blower motor overload (if any).
3. Follow the steps below to start the blower.  If prompted for a password on units made before 4/2005, enter
1793. For units made after 4/2005, enter 17 or 1793.  

If the blower does not turn the proper direction, a qualified person should disconnect electric power and

interchange any two of the branch circuit wires at the unit input lugs.  Torque the connectors as discussed
earlier.  

Do not move any factory installed wires.

4.  When air-flow adjustment is complete, the blower can be stopped by repeating the steps above.  If 
prompted for a password on units made before 4/2005, enter 1793. For units made after 4/2005, enter 17 or
1793.

If possible and safe, leave the electrical power connected to the unit and leave the blower overload

(if any) ON.  This will allow the compressor crankcase heater(s) to function.  The crankcase heaters
must be on continuously for at least 10 hours before the compressors are started.

Adjust airflow

Important!

Never run the blower without the filters in

place.  Regardless of filters, never run the
blower when construction dust is present.
The resulting heat exchanger damage is not
covered by the warranty.

Important!

Airflow must be set and confirmed

before the refrigeration system is
adjusted.

GO TO

AUTO/OFF CONTROLS

BLOWER                  Off
COMPRESSOR #1    Off
COMPRESSOR #2    Off

TURNING BLOWER

AUTO

ENTER TO CONFIRM
ESC TO CANCEL

Press       or       to toggle
between AUTOMATIC and OFF.
Then press         to confirm.
Press         repeatedly to return
to the main menu or default screen.

Press       repeatedly to reach screen below.

MAIN MENU

SCROLL DOWN

FOR OPTIONS

Default Screen

HUMIDITY

aaa / bbb %

ROOM AIR    ccc / ddd  F

Optional

Do not select 
compressor(s).

For a controller
interface map,
see 

Operation

.

Prg

Esc

HUMIDITY

aaa / bbb %

ROOM AIR    ccc / ddd  F

Esc

Esc

Esc

Esc

Esc

Summary of Contents for KACE Series

Page 1: ...ting with at least one 90o elbow or provide a sound baffle between the return air grille and unit filter Horizontal units are provided with isolation hanger support See Fig 2 for proper installation w...

Page 2: ...30 012 75 0 30 015 75 0 30 018 75 0 30 024 188 0 75 030 188 0 75 036 188 0 75 042 188 0 75 048 188 0 75 060 188 0 75 072 25 to 275 0 10 to 1 1 096 25 to 275 0 10 to 1 1 120 25 to 275 0 10 to 1 1 144 2...

Page 3: ...ONT BLOWER AND MOTOR ACCESS PANEL RETURN AIR SUPPLY AIR WATER IN WATER OUT CONDENSATE DRAIN TUBE LOW VOLTAGE IN POWER IN BLOWER ACCESS PANEL ELECTRICAL AND COMPRESSOR ACCESS PANEL ELECTRICAL ACCESS PA...

Page 4: ...N WATER OUT LOW VOLTAGE IN POWER IN ELECTRICAL ACCESS PANEL ELECTRICAL AND COMPRESSOR ACCESS PANEL WATER REGULATING VALVE ACCESS PANEL C Detail C 3 8 WASHER BY OTHERS 3 8 16 NUTS DOUBLE BY OTHERS 3 8...

Page 5: ...ts box Refer to the instruc tions included Separate the display into its three pieces Thread the end of the cable thorugh the hole in the sub base as shown Using care to maintain level screw the sub b...

Page 6: ...ration of the system Default screen present value set point is used to scroll downward through screens and to decrease settings Do not press and at the same time is used to scroll upward through scree...

Page 7: ...setting aa I O Board address bb Default Screen HUMIDITY aaa bbb ROOM AIR ccc ddd F xxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxx Prg Esc 2 Simultaneously press and hold the and buttons for at least fiv...

Page 8: ...Read Sensors or Operation Read Sensors This screen is the gateway to other screens used for setting the operating set points of the unit The set points are protected by a user password See Startup Adj...

Page 9: ...should disconnect electric power and interchange any two of the branch circuit wires at the unit input lugs Torque the connectors as discussed earlier Do not move any factory installed wires 4 When ai...

Reviews: