background image

1. Place the instrument on a level and 

    

firm surface, it must be capable of 

    

supporting the weight and load of the 

    

instrument, and the impact force 

    

generated by the motion. Prepare 

    

related parts (see Figure 1-1).

2. Install the horizontal universal 

    

platform on the fixed plate of the Main 

    

body, ensure all four mounting holes 

    

in the universal platform and the four 

    

threaded mounting holes are in 

    

alignment.

3. Fasten the universal platform and the 

    

fixed plate with four M4x14 cross 

    

recessed countersink head screws.

1.

 

Place the instrument on a level and 

    

firm surface, it must be capable of 

    

supporting the weight and load of the 

    

instrument, and the impact force 

    

generated by the motion. Prepare 

    

related parts (see Figure 1-2).

2. Install the horizontal universal

 

    

platform on the fixed plate of the Main 

    

body, ensure all four mounting holes 

    

in the universal platform and the four 

    

threaded mounting holes are in 

    

alignment.

3. Fasten the universal platform and the 

    

fixed plate with four M4x14 cross 

    

recessed countersink head screws.

1) M4x14 cross recessed countersink    
     head screws
2) Universal (aluminum) platform  
3) Main body of CO2 resistant shaker

1) M4x14 cross recessed countersink 
     head screws
2) 18inch (aluminum) platform
3) Main body of CO2 resistant shaker

3      Section 1  |  Unpacking and Installation

1.2 Universal (Aluminum) Platform Installation

1.4 Rubber Mat Platform Installation

1.5 Connections of the Instrument

1.3 18inch (Aluminum) Platform Installation

Figure 1-1

Figure 1-3

Figure 1-2

1) Rubber mat
2) M4x10 cross recessed countersunk 
     head screws
3) Platform
4) Main body of CO2 resistant shaker

Note:

1) When disconnecting the control box from   
     the main body, please cut off the power   
     first. 

2) No special cable needed to connect with 
     4-20mA data port. 

1. Place the instrument on a level and 

    

firm surface, it must be capable of 

    

supporting the weight and load of the 

    

instrument and the impact force 

    

generated by the motion. Prepare 

    

related parts (see Figure 1-3).

2. Install the horizontal platform on the 

    

fixed plate of the Main body, ensure all 

    

four mounting holes on the platform 

    

and the four threaded mounting holes 

    

are in alignment.

3. Fasten the platform and the fixed plate 

    

with four M4x10 cross recessed   

    

countersink head screws.

4. Place the rubber mat on the platform.

1) Main body of CO2 resistant shaker
2) Control box
3) Power adapter
4) Power cord  
5) 4-20mA data port

Refer to Figure 1-4 when connecting the instrument.

Figure 1-4

MaxQ 2000 CO2 Plus       4

 

88881122B

88881122

88881123

 88883101

 2M

 0.4M

 88881181

Summary of Contents for MaxQ 2000 CO2 Plus

Page 1: ...r online thermofisher ca For Research Use Only Not for use in diagnostic procedures 2020 Thermo Fisher Scientific Inc All rights reserved All trademarks are the property of Thermo Fisher Scientific an...

Page 2: ...xtended Warranty for your Thermo Scientific products Whatever Thermo Scientific products you need or use we will be happy to discuss your applications If you are experiencing technical problems workin...

Page 3: ...al Cable Output current of Control Box Maximum Shaking Speed Section 3 Operation Operations on the Control Panel Speed and Time Settings Alarm System Section 4 Application Section 5 Safety Tips Sectio...

Page 4: ...xQ 2000 CO2 Plus Promotion Package for EMEA APAC includes CO2 resistant shaker 88881102B Universal Platform Flask Clamp Starter Kit Main Body Control Box General Power Adaptor US Plug CN Plug EU Plug...

Page 5: ...recessed countersink head screws 2 18inch aluminum platform 3 Main body of CO2 resistant shaker 3 Section 1 Unpacking and Installation 1 2 Universal Aluminum Platform Installation 1 4 Rubber Mat Plat...

Page 6: ...00 m Humidity 20 to 99 non condensing 2 2 Environmental Conditions Rotation Speed Load Timer Dimensions Weight Power Supply Others 5 Section 2 Overview 2 3 Safety Tips 1 Unplug and unload before movin...

Page 7: ...1000ml 1000ml 250 2000ml 2000ml 200 3000ml 3000ml 200 5000ml 5000ml 150 Flask size Size Liquid volume Max Speed rpm 50ml 50ml 600 600 600 600 600 580 550 500 470 430 450 400 450 400 100ml 100ml 150ml...

Page 8: ...has been designed with a soft start slow down providing a smooth acceleration deceleration during operation This feature will decrease splashing of solutions from vessels during operation Warning The...

Page 9: ...operation the alarm will sound after 10 seconds if the unit has not begun shaking In addition the alarm will sound and stop for the speed over 650 rpm after 2 seconds 2 Once the shaker begins to alarm...

Page 10: ...e power cord 2 Remove the platform with 4 screws 3 Remove top plate with 7 screws 4 Use 70 ETOH to clean the inner area 5 All allow the unit to dry for one hour reassemble unit and operate normally Se...

Page 11: ...6mm 1 88881122B 18inch Aluminum platform N A 360x305x10 88881123 Rubber Mat platform 10 130x90x15 88881124 96 well microplate holder Table 6 2 18inch Aluminum Platform Description 50ml clamp 100ml cla...

Page 12: ...Accessories Section 7 Troubleshooting To troubleshoot the unit refer to the table below If your problem persists contact your local sales service representative Indicator off No reaction No rotating...

Page 13: ...the original warranty period The Technical Services Department must give prior approval for return of any components or equipment At Thermo s option all non conforming parts must be returned to Thermo...

Reviews: