![Thermo 8600 Series Operating And Maintenance Manual Download Page 26](http://html.mh-extra.com/html/thermo/8600-series/8600-series_operating-and-maintenance-manual_1104196026.webp)
8600 Series _______________________________________________________________________________Factory Options
6 - 2
6. Remove the two Phillips head screws securing the metal
bracket on the vent stack assembly.
7. Install the vent stack through the opening and secure it to
the top of the freezer, using screws.
8. Go to the interior and seal around the end of the vent
stack with permagum.
9. Install the transfer hose connecting one end to the injec-
tion assembly, the other end to the solenoid valve. Install
the solenoid valve to the supply source. The solenoid
mounting bracket is not required and may be discarded.
When selecting a CO
2
supply cylinder, it must be equipped with
a siphon tube.
b. Installing the Temperature Probe
10. Locate the 0.500” pre-punched hole in the upper left hand
back corner of the chamber ceiling. Remove the tie wrap
securing the coiled probe/solenoid harness. Uncoil the
probe lead and run the probe tip (approximately 12”)
down through
0.500” porthole
(Figure 6-4).
11. As shown in
Figure 6-3, thread
the small tie wrap
through the open-
ings in the front of
the bracket.
Secure the probe
on the back of the
bracket with the
tie wrap.
12. Tap #8-32 the two
pre-punched holes
located on the
interior left wall of the freezer. Mount the bracket.
Figure 6-4 shows the Back-Up probe mounted on the
interior left side wall of the freezer.
c. Connecting the probe/solenoid harness
13. Remove the four screws on the freezer back panel and
use them to mount the tie wrap anchors as shown in
Figure 6-5. Secure the probe wire with tie wraps.
14. Plug the solenoid/probe connector into the BUS connec-
tion and secure with a screw on the right and left side.
The connector is keyed.
15. Loosen the terminal screws on the solenoid. Slide the
spade lug connectors under the screws and tighten to
secure.
16. Connect power to the freezer. Leave the back-up battery
switch at the OFF position. Turn the freezer on. The
Inject light on the BUS control panel will illuminate but
no injection will occur. The Low Battery indicator may
also illuminate. Once the freezer has stabilized at the
operating temperature, turn the battery switch on.
Figure 6-3
Figure 6-4
Figure 6-5