1
Site Preparation
Lighting Requirements
Thermo Scientific
TSQ 8000 Preinstallation Requirements Guide
5
Lighting Requirements
Use the following guidelines to ensure your site has the proper lighting:
1. Ensure that the work area is properly lit. You may need an overhead lamp to light your
work area.
2. You may need a small, high-intensity lamp when you clean the TSQ 8000 or work inside
the GC column oven.
Power Requirements
Use the following guidelines to ensure your site is equipped with enough power to support the
system. All circuits should be 50/60 Hz ± 2 Hz, single-phase with < 6% total harmonic
distortion.
• Circuit 1:
TSQ 8000 MS plus the foreline pump and optional mech pump
.
100-240 Vac, 15 A
MAX
. The foreline pump and mech pump must be set to the line
voltage used at your location.
• Circuit 2:
GC
. 120 Vac +6/-10%, 16 A
MAX
or 230 Vac ±10%, 10 A
MAX
. Refer to
your customer sales order to determine if the GC is 120 Vac or 230 Vac. The GC
cannot be reconfigured in the field.
• Additional Circuits: Additional circuits are needed for the computer or other
equipment. 120 Vac +6/-10% or 230 Vac ±10%.
Note
Due to the power draw of the TSQ 8000 and GC, each instrument must be on its
own dedicated circuit. These two circuits must be separate from the circuits used for the
computer and other equipment such as the autosampler.
Table 3.
System Power Requirements (Sheet 1 of 2)
Equipment
Circuits
Max Current
(A) at 120 Vac
(+ 6/- 10%)
Max Current
(A) at 230 Vac
(± 10%)
Maximum Power (W)
TSQ 8000 MS
1
1
5.9
3.1
710
Foreline pump
2
N/A
4.6
2.7
550
Optional mech pump
2,3
N/A
4.6
2.7
550
TRACE 1300 and TRACE 1310
1
2
16
10
2000
Computer
4
Additional
(as needed)
5
2.6
600
Monitor
4
Additional
(as needed)
2
1
240
AI/AS 1310 Sampling systems
Additional
(as needed)
0.8
0.4
95
Summary of Contents for TSQ 8000
Page 1: ...TSQ 8000 Preinstallation Requirements Guide 1R120505 0001 Revision D April 2014 ...
Page 4: ......
Page 26: ......