Incubated and Refrigerated Shakers 4-1
Thermo Scientific
Section 4
Unpacking and Installation
The shipping carton should be inspected upon delivery. When received,
carefully examine for any shipping damage before unpacking. If damage is
discovered, the delivering carrier should specify and sign for the damage on
your copy of the delivery receipt.
Open the carton carefully making certain that all parts are accounted for
before packaging materials are discarded. After unpacking, if damage is
found, promptly report it to the carrier and request a damage inspection
properly.
Important
Failure to request an inspection of damage within a few days
after receipt of shipment absolves the carrier from any liability for damage.
Call for a damage inspection promptly.
Use the packing list below when unpacking to verify that the complete
unit has been received. Do not discard packing materials until all is
accounted for.
The following items are included in the shipment:
Inspection Tag- 528-028-00
Mounting Plate Mat- 790-316-13
Thumbscrew Knob (4) - 562-184-10
Male Connector (E-class only)- 420-359-00
If any items are missing, contact Technical Services.
Put the shaker on a level table or bench capable of supporting the weight
of the shaker with any accessories while in operation. Place shaker near an
electrical outlet that matches the unit nameplate requirements. Allow
approximately 2” (5 cm) of clearance around the unit for free air
convection, accessory attachments and user convenience. Shakers with
refrigeration should be placed near an accessible drain. Route the drainage
tube on the back of the unit to this drain.
Unpacking
Location