4
Setting up
Setting up
Thermo Scientific
21
2. Check that the inner filling solution covers the membrane.
To remove the air from the membrane surface:
1. Hold the electrode upright.
2. Gently flip the electrode in a downward direction.
Note
Do not knock the electrode on a hard surface.
Installing ECM electrodes
To install the electrodes:
1. Open the ECM unit cover.
2. Detach the clamp.
3. Open the clamp by pushing down the handle.
4. Loosen the thumb screw.
5. Push clamp all the way to the left.
6. Place the electrodes always from rod to probe according to the order in
on page 19.
7. Push the clamp and metal rod into place.
Note
The alignment rod should snap into place when a groove is in the right position. It
can be helpful to insert the rod as far as you can and then pull the rod back slowly until it
clicks into place.
8. Tighten the thumb screw.
9. Lift the clamp handle to clamp the electrodes into place. It does not require a great amount
of effort.
Note
The O-rings are more visible if the electrodes are clamped to the proper tightness.
10. Connect wires to each pin.
Note
Because of the grounding unused electrode wires have to be connected to the
GND4 circuit board behind the electrode block.
11. Install the reference filling solution bag.
Summary of Contents for Gallery Plus
Page 1: ......
Page 6: ...vi Thermo Scientific Figure 2 Safety labeling inside analyzer ...
Page 12: ... this page was intentionally left blank ...
Page 18: ... this page was intentionally left blank ...
Page 26: ... this page was intentionally left blank ...
Page 44: ...4 Setting up Setting up 26 Thermo Scientific 7 Connect the workstation s power cable ...
Page 47: ...A Thermo Scientific 29 Removing transport casing ...
Page 48: ... this page was intentionally left blank ...
Page 52: ... this page was intentionally left blank ...