Figure 1-6.
Platform Mounting Hole Locations
1. Insert the two 1/4-20 alignment pins into the two mounting holes
identified in Figures 1-5 and 1-6.
2. Rotate the drive mechanism until the four mounting holes generally
match the holes in the platform.
3. Place the platform onto the shaker and over the alignment pins.
4. Move the platform in an orbital motion until one or more of the
center mounting holes are located.
5. Insert the hex socket head screws as the four holes are located. Do not
tighten the screws.
6. Remove the 1/4-20 alignment pins and replace them with the
remaining two hex socket screws.
7. Tighten all screws using the T-handle wrench.
Caution
Use only the hex socket flat screws to fasten the platform, and
only the T-handle wrench to tighten the screws. Torque these screws to 10
ft/lbs.
▲
1-4
Orbital Shakers
Thermo Scientific
Section 1
Installation and Start-Up
Installing the Platform
(continued)
Summary of Contents for Forma 416
Page 1: ...Model 416 and 430 Forma Orbital Shakers Operating and Maintenance Manual 7000416 Rev 5...
Page 34: ...Orbital Shakers 2 15 Thermo Scientific...
Page 37: ......
Page 39: ......
Page 47: ......
Page 49: ......
Page 50: ...Orbital Shakers 7 1 Thermo Scientific...
Page 51: ...7 2 Orbital Shakers Thermo Scientific...
Page 54: ...Orbital Shakers 9 1 Thermo Scientific...