Disinfect all interior surfaces with a general-use laboratory disinfectant.
Rinse thoroughly with sterile distilled water, then 70% ethanol. Dry with a
sterile cloth as needed.
Disinfect the shelf channels and shelves, then rinse with distilled water
before installing.
Caution
Before using any cleaning or decontamination method except
those recommended by the manufacturer, users should check with the
manufacturer that the proposed method will not damage the equipment.
s
Caution
Accidental spills of hazardous materials on or inside this unit are
the responsibility of the user.
s
The shelves may be installed at any level in the incubator. Install a shelf
channel on each side. With the tabs pointing up, attach the channel by
locating the rivet into a slotted hole, far end first. Pull the channel toward
the front and slide the front rivet on the channel into the slotted hole and
press down. Make sure that the channels are opposite each other so that
the installed shelf will be level.
Place a bubble-type level on a shelf inside the incubator. Adjust the feet as
needed; counterclockwise to lengthen or clockwise to shorten. Level the
unit front-to-back and left-to-right.
1-4
29 cu ft Environmental Chamber
Thermo Scientific
Section 1
Installation and Start-Up
Preliminary Cleaning and
Disinfecting
Install the Shelves
Figure 1-5.
Shelf Channel on Side Duct
Level the Unit
Summary of Contents for 3960
Page 14: ...29 cu ft Environmental Chamber 1 7 Thermo Scientific Section 1 Installation and Start Up ...
Page 15: ......
Page 18: ...29 cu ft Environmental Chamber 2 3 Thermo Scientific Section 2 Calibration ...
Page 19: ......
Page 23: ...3 4 29 cu ft Environmental Chamber Thermo Scientific Section 3 Configuration ...
Page 29: ......
Page 37: ......
Page 39: ...8 2 29 cu ft Environmental Chamber Thermo Scientific Section 8 Parts CCS ...
Page 42: ...29 cu ft Environmental Chamber 8 5 Thermo Scientific Section 8 Parts ...
Page 43: ...8 6 29 cu ft Environmental Chamber Thermo Scientific Section 8 Parts CCS ...
Page 44: ...29 cu ft Environmental Chamber 8 7 Thermo Scientific Section 8 Parts ...
Page 45: ......
Page 46: ...29 cu ft Environmental Chamber 9 1 Thermo Scientific Section 9 Electrical Schematics ...
Page 47: ...9 2 29 cu ft Environmental Chamber Thermo Scientific Section 9 Electrical Schematics ...
Page 48: ...29 cu ft Environmental Chamber 9 3 Thermo Scientific Section 9 Electrical Schematics ...
Page 49: ...9 4 29 cu ft Environmental Chamber Thermo Scientific Section 9 Electrical Schematics ...
Page 50: ...29 cu ft Environmental Chamber 10 1 Thermo Scientific Section 10 Appendix ...
Page 51: ......