2-3
2.2 Probe
Installation
1.
The probe must be installed in a vertical position, suspended at a flexible joint
that allows free movements in all directions.
2.
Carefully chose the location of the Probe. It is very important to choose the right
installation position so the material flow will cause a tilt action and not bury the
probe.
Normal Installation
When there is no chance of material damaging the flex.
.
Shielded Installation
When flex protection is needed and the
probe can traverse to alarm position.
Flex slack
Shield
Summary of Contents for 20-35-NM-DIN
Page 2: ...ii ...
Page 6: ...vi ...
Page 11: ...xi ...
Page 18: ...xviii PROBE Models 20 54 NM SS 20 52 NM 20 59 NM 20 55 NM P TAG MARKING CE Certification CE ...
Page 24: ...1 6 ...
Page 28: ...2 4 Figure 2 3 Probe Model 20 54 NM SS Stainless Steel Probe Dimensions are inches and mm ...
Page 29: ...2 5 Figure 2 4 Probe Model 20 52 NM Heavy Weight Probe Dimensions are inches and mm ...
Page 30: ...2 6 Figure 2 5 Probe Model 20 59 NM Steel Probe Dimensions are inches and mm ...
Page 31: ...2 7 Figure 2 6 Probe Model 20 55 NM P Plastic Probe Dimensions are inches and mm ...
Page 33: ...2 9 Figure 2 8 Control Unit Model 20 35 NM F Internal Layout ...
Page 35: ...2 11 Figure 2 10 Control Unit Model 20 35 NM DIN Internal Layout FAULT ...
Page 36: ......
Page 38: ...3 2 Low Application Examples Typical Plugged Transfer Chute Alarms ...