background image

ALL INSTALLATIONS AND SERVICE MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL.

 

 

CARBON MONOXIDE POISONING, FIRE AND EXPLOSION HAZARD. 

 
Failure to follow this warning could result in death, personal injury and/or  property 
damage. 
 
Do not operate the furnace with the rain cap removed as recirculation of the flue gases 
may occur.  Water may also collect inside the larger combustion air pipe and flow to the 
burner enclosure.

 

  

 

 

6.  Install the wye fitting and outer pipe assembly (Fig-5) through the structure’s 

hole.  For vertical termination, install the parts through the field supplied roof 
boot/flashing.  

NOTE:  

Do not allow insulation or other materials to accumulate 

inside the pipe assembly when installing through the structure’s hole. 

 

7.  Secure the assembly to the structure as shown in (Fig-2) or (Fig-3) using field 

supplied metal strapping or equivalent material. 

 

NOTE:  

Ensure the termination height is above the roof surface or anticipated 

snow level as shown in (Fig-2) for vertical termination.  Ensure the termination 
location clearance dimensions are as shown in (Fig-3) for horizontal termination. 
 

8.  Install the rain cap and the small diameter inner pipe assembly (Fig-6) in the wye 

fitting and large outer pipe assembly (Fig-5).  Ensure that the small diameter 
inner pipe is bottomed out and securely cemented in the wye fitting. 

 
9.  Cement the furnace combustion air and vent pipes to the concentric vent 

termination assembly.  See (Fig-2) or (Fig-3) for proper pipe attachment. 

 

10. Operate the furnace through one heat cycle to ensure combustion air and vent  

pipes are properly connected to the concentric termination connections. 

 8  

Reviews: