background image

ALL INSTALLATIONS AND SERVICE MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL.

 

5.  Partially assemble the concentric vent termination kit.  Clean and cement the 
parts using the procedures for Joining Pipe and Fittings section of the furnace 
installation manual.  A) Cement the wye fitting to the larger diameter outer pipe. 
(see  Fig-5)  B) Cement the rain cap to the smaller diameter inner pipe. (see Fig-6)  

NOTE:

  A field supplied stainless steel screw may be used to secure the rain cap to 

the inner pipe instead of cementing when field disassembly is desired for cleaning 
(see Fig-7).

 

 

 

WYE FITTING

FIG-5

FIG-6

OUTER PVC

PIPE

RAIN

CAP

INNER PVC
PIPE

APPLY PVC

CEMENT

THIS END

FIG-7

STAINLESS STEEL
SCREW
(FIELD SUPPLIED)

NOTE:

 DRILL CLEARANCE HOLE IN

RAIN CAP AND PILOT HOLE IN

VENT PIPE

 
 
 

 

CARBON MONOXIDE POISONING, FIRE AND EXPLOSION HAZARD. 

 
Failure to follow this warning could result in death, personal injury and/or  property 
damage. 
 
When using the alternate screw assembly method, drill a clearance hole in the rain cap 
and a pilot hole in the vent pipe for screw size being used.  Failure to drill adequate 
holes cause cracking o the PVC components, allowing flue gasses to be recirculated.

 

  

 

 

 7  

Reviews: