
Installation and Service Check List
Boiler Model: ______________________________
Serial No.: ____________________________
Installation Date: ___________________________
Installer Name: _____________________________
Phone No.: ____________________________
Boiler Installation
q
Boiler level and in solid contact with floor?
q
Boiler and burner wired per wiring diagram and National Electric Code? 120VAC wiring
Type_______ Size_______ AWG
q
Burner sealed to boiler? Mounting nuts tight?
q
Space is large enough to provide required clearances?
q
NFPA 31 Installation of Oil Burning Equipment followed?
q
Local, state and national codes, laws, regulations and ordinances followed?
Vent System
q
Existing chimney and vent system inspected to NFPA 211 and in good condition?
q
New vent pipe installed and properly sealed?
q
Vent size checked against furnace manual and codes?
Burner Operation
q
Burner Model: ____________________ Nozzle: _____ GPH _____ Deg. _____ Type _____
q
Burner Pump Pressure: _________________
q
Fuel Filer and fuel lines installed and inspected as per burner manual?
q
Air bled from oil piping? Piping checked for leaks?
q
Burner started, adjusted and tested per burner manual?
Boiler Operation
q
Thermostat heat anticipator set per burner manual instructions?
q
Limit control tested for proper operation?
q
Boiler observed going through several operational cycles for proper operation?
Post Installation
q
Reviewed owners’ information in this manual with owner or maintenance personnel
and instructed to keep for future reference?
q
Inserted burner manual instructions with boiler manual for future use
MET-3381
1/08-250