- 12 -
STEP 5:
Connecting the Solid Linkage
1. Connect the solid linkage through the bottom fix plate using the Ø8 flat washer and tighten with an
M8 lock nut.
2. Connect the other end of the linkage to the flow control with an Ø8 flat washer and M8 lock nut.
3. Install the hopper screen in the bottom of the hopper.
4. Before using the spreader make sure all the hardware is tightened.
5. Use the rain cover as needed to protect material in the hopper or when spreader is being stored.
Summary of Contents for THS125
Page 7: ... 7 Component Parts ...
Page 19: ... 19 Parts Drawing Parts List ...
Page 22: ... 22 ...
Page 23: ... 23 ...