5. ENGINE REMOVAL
5-8
Torque valve:
Engine mounting bracket bolt 26 N-m
(2.6kgf-m,or 19lb-ft)
Apply sealant to the screw.
Apply sealant to the propeller shaft flange coupling bolts.
Tighten them to the standard torque.
Apply sealant to the front propeller shaft flange coupling bolts.
Tighten them to the standard torque.
Torque value:
Front and rear propeller shaft flange coupling bolt:
45N-m(4.5kgf-m, 32.5lb-ft)
Install the new gasket.
.
Apply
sealant
to the muffler mounting bolt
Install muffler. Pay attention don
’
t damage the
connector.
Tighten the exhaust pipe nuts and muffler bolts with
specified torque.
PDF created with pdfFactory Pro trial version
www.pdffactory.com
Summary of Contents for Blade 525
Page 44: ...PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 56: ...4 FUEL SYSTEM 4 12 Notes PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 68: ...5 ENGINE REMOVAL 5 12 PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 71: ...5 ENGINE REMOVAL 5 14 Note PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 108: ...PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 159: ...PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 169: ...13 BODY COVER 13 10 PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 206: ...PDF created with pdfFactory Pro trial version www pdffactory com ...