
10. ALTERNATOR/STARTING CLUTCH
10-8
A.C.G. Set Installation
Install the A.C.G. coil set onto right crankcase cover (3
screws).
Install pulse generator (3 screws).
Tie the wire harness securely onto the indent of
crankcase.
Left Crankcase Cover Installation
Install dowel pin and new gasket.
Remove water pump cover.
Install left crankcase cover onto the crankcase.
Note: Align the water pump shaft indent with the water
pump gear shaft.
Dowel pin
Make sure that the wire harness is placed under
pulse generator.
3 screws
3 bolts
Wire
PDF created with pdfFactory Pro trial version
www.pdffactory.com
Summary of Contents for Blade 525
Page 44: ...PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 56: ...4 FUEL SYSTEM 4 12 Notes PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 68: ...5 ENGINE REMOVAL 5 12 PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 71: ...5 ENGINE REMOVAL 5 14 Note PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 108: ...PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 159: ...PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 169: ...13 BODY COVER 13 10 PDF created with pdfFactory Pro trial version www pdffactory com ...
Page 206: ...PDF created with pdfFactory Pro trial version www pdffactory com ...