
Operation - 4 - 8
CD397-Oper
August 2018 (Rev B)
Mobile Belt Loader Model 660-28
Operation
Operation Manual
Section 4
4.2
Preparation
for
Operation
4.2.1
Tie-Down
Points
(Truck
Shipping)
Remove tie-downs from the forward and rear of the belt loader.
4.2.2
Battery
Connect battery terminals to battery posts.
4.2.3
Engine
No special requirements.
4.2.4
Conveyor
Belt
1. Remove the tie down straps and the conveyor bubble wrap at the three (3) wooden supports.
2. Thread the conveyor lifting strap around the mid-point of the conveyor (Figure Operation-4-13
Threading Conveyor Lifting Strap).
Figure
Operation-4-13:
Threading
Conveyor
Lifting
Strap
3. Using two (2) people, slowly raise the conveyor.
WARNING:
ENSURE ALL FUEL LINES ARE PROPERLY CONNECTED FROM TANK TO FUEL
PUMP TO INJECTOR PUMP.
NOTE:
One person controls the crane while the second person supports the rear end of the con-
veyor as shown in Figure Operation-4-14 Conveyor Lift Support.
WARNING
Property
of
American