Installation
3.1. Opening and inspecting packing crates
A
Remove all screws on the upper side of the packing crate.
B
Remove the cover and place it to one side.
C
Remove the screws from the upper crossbars
D
Remove the crossbars and place them to one side
E
Loosen the screws of the side cover.
F
Remove the side cover.
G
Make sure the contents are complete and without damage.
3.2. Initial leveling of the base frame
A
Lift each side support end to keep the balance by precision spirit level.
B
Determine the lowest position of the foot and use the setscrews to adjust it upwards.
C
Use the setscrew to raise the position of the lowest foot.
Note:
Prevent
the
crate
cover
from
warping
when
placed
at
an
angle.
Place
the
packing
crate
level.
Note:
•
Only
complete
the
installation
if
all
parts
are
present
and
undamaged.
•
Inform
customer
service
if
any
parts
are
missing
or
damaged.
•
Replenish
or
replace
missing
or
damaged
parts.
Summary of Contents for XYZ 2517
Page 1: ...TEXI XYZ 2517...
Page 4: ......
Page 17: ...13 Without Length Length 2 4m Width Width 2 4m...
Page 19: ...15 M16 x 70mm...
Page 20: ...16 3 3 Base machine installation Picture 1...
Page 21: ...17 Picture 2...
Page 22: ...18 Picture 3 Picture 4...
Page 26: ...22 3 5 Assemble the Milling support device The total height 2 8 m...
Page 27: ...23 3 5 1 Connect cables in the milling device support...
Page 31: ...27...