Precision spirit level
To level the machine foot
2.
Preconditions
2.1. Installation location
Make sure that the following requirements are met:
•
the installation location is level and can withstand the floor loads.
•
the shipping crates can be deposited close to the installation location and their presence does not prevent
the machine from being assembled.
•
the aisle width from the unloading location to the installation location is at a minimum the width
required for the dimensions of the packing crates.
•
the electrical and air connections meet the requirements listed in the technical data.
•
the installation location is well-lit.
•
At least 1 meter of space is available all around the cutting system for service and daily operation.
2.2. Personnel
Make sure that the following requirements are met:
•
the support personnel wear safety clothing and work gloves.
•
the support personnel are familiar with the hazards associated during machine installation and
have read and understood the mounting instructions.
2.3. Power requirement ( 50HZ / 60HZ Voltage±5% )
Three
-phase
Vacuum
Pump
Voltage
Electric
Current
Air
Circuit
Breaker
Wire
Size
Wiring System
5.5KW
380V
8.3A
20A
6mm²
L1
、
L2
、
L3
、
N
、
G
7.5KW
380V
12A
20A
6mm²
L1
、
L2
、
L3
、
N
、
G
Three
-phase
Vacuum
Pump
Voltage
Electric
Current
Air
Circuit
Breaker
Wire
Size
Wiring System
Summary of Contents for XYZ 2517
Page 1: ...TEXI XYZ 2517...
Page 4: ......
Page 17: ...13 Without Length Length 2 4m Width Width 2 4m...
Page 19: ...15 M16 x 70mm...
Page 20: ...16 3 3 Base machine installation Picture 1...
Page 21: ...17 Picture 2...
Page 22: ...18 Picture 3 Picture 4...
Page 26: ...22 3 5 Assemble the Milling support device The total height 2 8 m...
Page 27: ...23 3 5 1 Connect cables in the milling device support...
Page 31: ...27...